SCHEDULE 1CONTROLLED RESERVOIRS: INFORMATION TO BE REGISTERED

This schedule has no associated Policy Notes

1.  The name (if any) and location of the reservoir.

2.  The maximum volume of water capable of being held in the reservoir.

3.  The reservoir manager’s name and business address, email and telephone number(s) (including a telephone number for making contact outside normal working hours or in an emergency).

4.  If the reservoir manager is not an individual, the name of an individual who is authorised by the reservoir manager to carry out any action required of the reservoir manager under the Act, together with the individual’s business address, email and telephone number(s) (including a telephone number for making contact outside normal working hours or in an emergency).

5.  The reservoir owner’s name and business address, email and telephone number(s) (including a telephone number for making contact outside normal working hours or in an emergency).

6.  To the extent known or readily obtainable by the reservoir manager, any risk designation the reservoir may have had immediately before the date on which it was required to be registered (and the date on which any such designation was given).

7.  To the extent known or readily obtainable by the reservoir manager, the name and business address, email and telephone number(s) (including a telephone number making contact outside normal working hours or in an emergency) of each (if any)—

(a)construction engineer;

(b)inspecting engineer;

(c)other qualified engineer; or

(d)supervising engineer,

appointed at any time in relation to the reservoir (and the period of any such appointment).

8.  Where applicable—

(a)the date on which the reservoir was last inspected under section 10 of the 1975 Act;

(b)details of any measure recommended (in the report of that inspection) to be taken in the interests of safety which has not been carried into effect, including the date recommended (in the report) by which the measure is (or was) to be taken; and

(c)the date by which the next inspection is required under that section.

9.  For each structure or area referred to in section 1(2) of the Act (or, as the case may be, each structure or area in a combination referred to in section 1(3)) comprising the reservoir, the—

(a)name (if any);

(b)national grid reference;

(c)status (in use, discontinued, abandoned or under construction);

(d)top water level (in metres above ordnance datum);

(e)surface water area (in square metres) at top water level;

(f)surface water area (in square metres) at dam crest level (if known);

(g)capacity (in cubic metres) at top water level;

(h)capacity (in cubic metres) at dam crest level (if known);

(i)type (impounding, non-impounding or service reservoir); and

(j)purpose(s) for which the reservoir is (or is to be) used.

10.  For each part of a structure or area referred to in section 1(2) of the Act (or, as the case may be, for each structure or area in a combination referred to in section 1(3)) comprising a dam, reservoir wall or embankment, the—

(a)name (if any);

(b)national grid reference;

(c)materials used to construct it (earth, concrete, masonry, rock fill, other);

(d)type (buttress, embankment, gravity arch, non-gravity arch, service);

(e)maximum height (in metres);

(f)bottom level (in metres above ordnance datum) at ground level;

(g)crest level (in metres above ordnance datum);

(h)crest length (in metres);

(i)escapable volume of water (in cubic metres) at top water level (if available);

(j)escapable volume of water (in cubic metres) at dam crest level (if available);

(k)fetch (namely the effective length of the controlled reservoir, of which the structure or area forms part, over which wind can build up waves) and direction (if available);

(l)year completed; and

(m)maintenance arrangements.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Policy Note

Policy Note sets out a brief statement of the purpose of a Scottish Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Scottish Statutory Instrument accessible to readers who are not legally qualified and accompany any Scottish Statutory Instrument or Draft Scottish Statutory Instrument laid before the Scottish Parliament from July 2012 onwards. Prior to this date these type of notes existed as ‘Executive Notes’ and accompanied Scottish Statutory Instruments from July 2005 until July 2012.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources