The Peterhead Port Authority Harbour Revision Order 2015

Temporary stopping up of roads and Bay Footpath

22.—(1) The Authority may in the construction of the works temporarily stop up or otherwise interfere with so much of—

(a)Bridge Street as lies between the points marked T6 and T7; and

(b)Castle Street as lies between the points marked T8 and T9;

(c)shown on plan A.

(2) The Authority may during the construction of the works temporarily stop up so much of Bay Footpath as lies between the points T1 and T2 shown on plan B and shall provide a reasonable temporary substitute in the position shown between the points marked T1, T3, T4, T5 and T2 on plan B throughout the period of such temporary stopping up.

(3) In this article “Bay Footpath” means the path along Smith Embankment in Peterhead Bay, Aberdeenshire.