The West of Scotland Water Authority (Lochnaw) Ordinary Drought Order 2000

SCHEDULE

The works referred to in this Order and shown marked on the deposited plan are:–

  • Work No. 1: Installing an intake and flow gauge.

  • Work No. 2: Laying of a pump and overland pipeline from grid reference NGR NW 993 629 in Lochnaw with a mid stage pump at grid reference NGR NX 010 617 to Dindinnie Reservoir at grid reference NGR NX 021 607.

  • Work No. 3: Installing a gauge to measure the level of the water in Lochnaw during the relevant period by reference to its level immediately before the Authority first takes water under this Order.