xmlns:atom="http://www.w3.org/2005/Atom"

Article 2

SCHEDULE 1

The works referred to in this Order and shown on the deposited plan are–

Works No. 1An intake pipe 40 metres or thereby in length leading from an intake structure on the Allt Dail A'Chairn incorporating an approved side weir and line of flow weir arranged to limit abstraction from the river such that a supply is taken only when stream flow exceeds the specified residual flowrate.
Works No. 2A treatment works containing an approved gauge and instrumentation to measure and record the amount of water taken from the intake.

Article 3

SCHEDULE 2

The modifications and adaptations of Schedule 4 to the Act referred to in Article 3 of this Order are–

Section 10(3)

If the West of Scotland Water Authority–

(a)fail to construct or maintain in good order any such gauge as is mentioned in the West of Scotland Water Authority (Kilberry, Allt Dail A'Chairn) Water Order 1999, or refuse to allow any person interested to inspect and examine any such gauge or any records made thereby or kept them in connection therewith or to take copies of any such records; or

(b)take any water contrary to the provisions of the West of Scotland Water Authority (Kilberry, Allt Dail A'Chairn) Water Order 1999,

they shall, without prejudice to their civil liability, if any, to a person aggrieved, be liable, in the case of an offence under paragraph (a) of this subsection, on summary conviction to a fine not exceeding level 3 on the standard scale and, in the case of an offence under paragraph (b) of this subsection–

(i)on summary conviction, to a fine not exceeding the statutory maximum; and

(ii)on conviction on indictment, to a fine.