xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULE 1ESSENTIAL HEALTH AND SAFETY REQUIREMENTS

COMMON REQUIREMENTS FOR EQUIPMENT AND PROTECTIVE SYSTEMS

General requirements

Overloading of equipment

14.  Dangerous overloading of equipment shall be prevented at the design stage by means of integrated measurement, regulation and control devices, such as over-current cut-off switches, temperature limiters, differential pressure switches, flowmeters, time-lag relays, overspeed monitors or similar types of monitoring devices, or both overspeed monitors and similar types of monitoring devices.