The Renewables Obligation Closure (No.2) Order (Northern Ireland) 2016

Small onshore wind generating stations accredited, or additional capacity added, between 1st July 2016 and 30th June 2017: grid or radar delay condition met

This section has no associated Explanatory Memorandum

5.—(1) The circumstances set out in this Article are where the electricity is—

(a)generated using the original capacity of a small onshore wind generating station—

(i)which was accredited during the period beginning with 1st July 2016 and ending with 30th June 2017, and

(ii)in respect of which the grid or radar delay condition is met, or

(b)generating using additional capacity of a small onshore wind generating station, where—

(i)the station was accredited on or before 30th June 2016,

(ii)in the Authority’s view, the additional capacity first formed part of the station during the period beginning with 1st July 2016 and ending with 30th June 2017, and

(iii)the grid or radar delay condition is met in respect of the additional capacity.