xmlns:atom="http://www.w3.org/2005/Atom"
Table 1 (Marine Construction Licence) is categorised into 9 bands which reflect the size and scale of the project, in monetary terms. The applicant will be required to pay the licence fee (Column 2) on submission of an application.
Tables 2 (Maintenance Dredging Licence), 3 (Capital Dredging Licence), 4 (Maintenance Dredge Disposal Licence) and 5 (Capital Dredge Disposal Licence) are all categorised into bands which reflect the metric tonnages of material to be dredged or disposed of. In each case, the applicant will be required to pay the Licence Fee (Column 2) on submission of an application.
Tables 6 (Deposit of Tracer Dyes, Biocides and Other Such Materials Licence) and 7 (Marine Minerals Extraction Licence) each have a single band. The fee to be paid by the applicant on submission of an application is as indicated.
Table 8 (Marine Renewable Energy Licence) is categorised into 4 bands which reflect the size and scale of the project, in terms of its output in Megawatts. The applicant will be required to pay the Licence Fee (Column 2) on submission of an application.
Column 1 Banded values in monetary terms | Column 2 Licence Fee |
---|---|
Band A Up to £19,999 | £550 |
Band B £20,000 - £49,999 | £759 |
Band C £50,000 - £199,999 | £1,446 |
Band D £200,000 - £499,999 | £2,075 |
Band E £500,000 - £999,999 | £2,410 |
Band F £1,000,000 - £2,999,999 | £4,506 |
Band G £3,000,000 - £4,999,999 | £5,554 |
Band H £5,000,000 - £19,999,999 | £6,602 |
Band I £20,000,000 and above | £10,795 |
Column 1 Banded values in terms of mass of material dredged. (t = tonne) | Column 2 Licence Fee |
---|---|
Band 1 0 – 9,999t | £250 |
Band 2 10,000t – 24,999t | £300 |
Band 3 25,000t – 49,999t | £350 |
Column 1 Banded values in terms of mass of material dredged. (t = tonne) | Column 2 Licence Fee |
---|---|
Band 1 0 – 9,999t | £902 |
Band 2 10,000t – 24,999t | £1,253 |
Band 3 25,000t – 49,999t | £1,704 |
Band 4 50,000t – 99,999t | £2,405 |
Band 5 100,000t – 499,999t | £3,358 |
Band 6 500,000t – 999,999t | £4,761 |
Band 7 1,000,000t and above | £8,019 |
Column 1 Banded values in terms of mass of material disposed. (t = tonne) | Column 2 Licence Fee |
---|---|
Band 1 0 – 9,999t | £2,017 |
Band 2 10,000t – 24,999t | £2,751 |
Band 3 25,000t – 49,999t | £3,856 |
Band 4 50,000t – 99,999t | £5,428 |
Band 5 100,000t – 499,999t | £7,650 |
Band 6 500,000t – 999,999t | £10,795 |
Band 7 1,000,000t and above | £18,131 |
Column 1 Banded values in terms of mass of material disposed. (t = tonne) | Column 2 Licence Fee |
---|---|
Band 1 0 – 9,999t | £2,709 |
Band 2 10,000t – 24,999t | £3,715 |
Band 3 25,000t – 49,999t | £5,208 |
Band 4 50,000t – 99,999t | £7,367 |
Band 5 100,000t – 499,999t | £10,365 |
Band 6 500,000t – 999,999t | £14,672 |
Band 7 1,000,000t and above | £24,723 |
Licence Fee |
---|
£419 |
Licence Fee |
---|
£29,345 |
Column 1 Banded values in terms of the project’s power output. (MW = Megawatts) | Column 2 Licence Fee |
---|---|
Band R1 0 – 0.99MW | £4,009 |
Band R2 1.0MW – 9.99MW | £12,530 |
Band R3 10MW – 99.9MW | £20,550 |
Band R4 100MW and above | £30,574 |