xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULE 2TSE MONITORING

PART IICONTENTS OF A REQUIRED METHOD OF OPERATION (RMOP)

Other measures following brain stem sampling

7.  The RMOP must describe the systems in place that ensure that—

(a)brain stem samples are packaged in accordance with packaging instructions P650 of the European Agreement Concerning the International Carriage of Dangerous Goods by Road (version applicable as from 2009(1)) and delivered in a testable condition to an approved testing laboratory;

(b)BSE test results are received, either by fax or by other electronic means; and

(c)all carcases or parts of carcases required to be disposed of in accordance with point 6(4) or 6(5) of Part I of Chapter A of Annex III to the EU TSE Regulation or under paragraphs 14(2) and (3) of Part I of this Schedule are identified and disposed of accordingly.

(1)

ISBN 978-92-1-139131-2