xmlns:atom="http://www.w3.org/2005/Atom"

Manner of erection and installation

6.—(1) Every automatic discontinuous totaliser shall be so positioned as to facilitate cleaning and testing.

(2) If any special equipment for an automatic discontinuous totaliser, as referred to in paragraph 9(5) of Schedule 1 to the 2006 Regulations, is not a permanent fixture of the instrument, it shall be kept in the vicinity of the instrument.

(3) An automatic discontinuous totaliser which has either a non-automatic zero-setting device or semi-automatic zero-setting device shall be erected in such a manner that the operator can, notwithstanding the nature of the instrument or its surroundings, readily take up a position from which he can check the zero and operate the zero setting controls.