xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULE 3PARTICULARS TO BE INCLUDED IN A SAFETY CASE FOR THE OPERATION OF A PRODUCTION INSTALLATION

4.  A description, with suitable diagrams, of—

(a)the main and secondary structure of the installation and its materials;

(b)its plant;

(c)the layout and configuration of its plant;

(d)the connections to any pipeline or installation; and

(e)any wells connected or to be connected to the installation.