SCHEDULE 1CONTENT OF GEOTECHNICAL ASSESSMENTS

Design coming out of analysis

7.  An accurate plan on a scale not less detailed than 1:2,500 recording—

(a)in relation to tips or proposed tips, the design of the tip, including the area of land covered or to be covered, the gradients of that land, the designed contours at vertical intervals of not more than two metres, the side slopes and boundaries of the tip and the designed position and nature of construction of any wall or other structure retaining or confining the tip; and

(b)in relation to excavations or proposed excavations, the design of the excavation, including the height or proposed height of the slope, the position and width of any benches and representative contours of the excavation at vertical intervals of not more than five metres.