The Pollution Prevention and Control Regulations (Northern Ireland) 2003

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

CHAPTER 2PRODUCTION AND PROCESSING OF METALS

SECTION 2.1FERROUS METALS
Part A

(a)Roasting or sintering metal ore, including sulphide ore, or any mixture of iron ore with or without other materials.

(b)Producing, melting or refining iron or steel or any ferrous alloy, including continuous casting, except where the only furnaces used are–

(i)electric arc furnaces with a designed holding capacity of less than 7 tonnes, or

(ii)cupola, crucible, reverbatory, rotary, induction or resistance furnaces.

(c)Processing ferrous metals and their alloys by using hot-rolling mills with a production capacity of more than 20 tonnes of crude steel per hour.

(d)Loading, unloading or otherwise handling or storing more than 500,000 tonnes in total in any period of 12 months of iron ore, except in the course of mining operations, or burnt pyrites.

(e)Producing pig iron or steel, including continuous casting, in a plant with a production capacity of more than 2.5 tonnes per hour unless falling within paragraph (b) of this Part of this Section.

(f)Operating hammers in a forge, the energy of which is more than 50 kilojoules per hammer, where the calorific power used is more than 20 megawatts.

(g)Applying protective fused metal coatings with an input of more than 2 tonnes of crude steel per hour.

(h)Casting ferrous metal at a foundry with a production capacity of more than 20 tonnes per day.

Part B

Casting iron, steel or any ferrous alloy from deliveries of 50 tonnes or more of molten metal, unless falling within Part A of this Section.

Part C

(a)Producing pig iron or steel, including continuous casting, in a plant with a production capacity of 2.5 tonnes or less per hour, unless falling within paragraph (b) of Part A of this Section.

(b)Producing, melting or refining iron or steel or any ferrous alloy (other than producing pig iron or steel, including continuous casting) using–

(i)one or more electric arc furnaces, none of which has a designed holding capacity of 7 tonnes or more; or

(ii)a cupola, crucible, reverberatory, rotary, induction or resistance furnace,

unless falling within paragraph (e) or (h) of Part A of this Section.

(c)Desulphurising iron, steel or any ferrous alloy.

(d)Heating iron, steel or any ferrous alloy (whether in a furnace or other appliance) to remove grease, oil or any other non-metallic contaminant (including such operations as the removal by heat of plastic or rubber covering from scrap cable) unless–

(i)it is carried out in one or more furnaces or other appliances the primary combustion chambers of which have in aggregate a rated thermal input of less than 0.2 megawatts;

(ii)it does not involve the removal by heat of plastic or rubber covering from scrap cable or of any asbestos contaminant; and

(iii)it is not related to any other activity falling within this Part of this Section.

Interpretation of Section 2.1

In this Section, “ferrous alloy” means an alloy of which iron is the largest constituent, or equal to the largest constituent, by weight, whether or not that alloy also has a non-ferrous metal content greater than any percentage specified in Section 2.2.

SECTION 2.2NON-FERROUS METALS
Part A

(a)Producing non-ferrous metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic activities.

(b)Melting, including making alloys, of non-ferrous metals, including recovered products (refining, foundry casting etc.) where the plant has a melting capacity of more than 4 tonnes per day for lead or cadmium or 20 tonnes per day for all other metals.

(c)Refining any non-ferrous metal or alloy, other than the electrolytic refining of copper, except where the activity is related to an activity described in paragraph (a) or (c) of Part B, or paragraph (c) of Part C of this Section.

(d)Producing, melting or recovering by chemicals means or by the use of heat, lead or any lead alloy, if–

(i)the activity may result in the release into the air of lead; and

(ii)in the case of lead alloy, the percentage by weight of lead in the alloy in molten form is more than 23 per cent if the alloy contains copper and 2 per cent in other cases.

(e)Recovering any of the following elements if the activity may result in their release into the air: gallium; indium; palladium; tellurium; thallium.

(f)Producing, melting or recovering (whether by chemical means or by electrolysis or by the use of heat) cadmium or mercury or any alloy containing more than 0.05 per cent by weight of either of those metals or, in aggregate, of both.

(g)Mining zinc or tin bearing ores where the activity may result in the release into water of cadmium or any compound of cadmium in a concentration which is greater than the background concentration.

(h)Manufacturing or repairing involving the use of beryllium or selenium or an alloy containing one or both of those metals if the activity may result in the release into the air of any of the substances listed in paragraph 12 of Part 2 to this Schedule; but an activity does not fall within this paragraph by reason of it involving an alloy that contains beryllium if that alloy in molten form contains less than 0.1 per cent by weight of beryllium and the activity falls within paragraph (a) or (c) of Part B of this Section.

(i)Pelletising, calcining, roasting or sintering any non-ferrous metal ore or any mixture of such ore and other materials.

Interpretation of Part A

In paragraph (g), “background concentration” means any concentration of cadmium or any compound of cadmium which would be present in the release irrespective of any effect the activity may have had on the composition of the release and, without prejudice to the generality of the foregoing, includes such concentration of those substances as is present in–

(i)water supplied to the site where the activity is carried out;

(ii)water abstracted for use in the activity; and

(iii)precipitation onto the site on which the activity is carried out.

Part B

(a)Melting, including making alloys, of non-ferrous metals (other than tin or any alloy which in molten form contains 50 per cent or more by weight of tin), including recovered products (refining, foundry casting, etc.) in plant with a melting capacity of 4 tonnes or less per day for lead or cadmium or 20 tonnes or less per day for all other metals and where the designed holding capacity of molten meal is 0.5 tonnes or more (together with any additional refining).

(b)Melting zinc or a zinc alloy in conjunction with a galvanising activity at a rate of 20 tonnes or less per day unless described in paragraph (g) of Part A of Section 2.1.

(c)Melting zinc, aluminium or magnesium or an alloy of one or more of these metals in conjunction with a die-casting activity at a rate of 20 tonnes or less per day.

Part C

(a)Melting, including making alloys, of non-ferrous metals (other than tin or any alloy which in molten form contains 50 per cent or more by weight of tin), including recovered products (refining, foundry casting, etc.) in plant with a melting capacity of 4 tonnes or less per day for lead or cadmium or 20 tonnes or less per day for all other metals and where the designed holding capacity of molten metal is less than 0.5 tonnes (together with any additional refining).

(b)The heating in a furnace or any other appliance of any non-ferrous metal or non-ferrous metal alloy for the purpose of removing grease, oil or any other non-metallic contaminant, including such operations as the removal by heat of plastic or rubber covering from scrap cable, if not related to another activity described in this Part of this Section; but an activity does not fall within this paragraph if–

(i)it involves the use of one or more furnaces or other appliances the primary combustion chambers of which have in aggregate a net rated thermal input of less than 0.2 megawatts; and

(ii)it does not involve the removal by heat of plastic or rubber covering from scrap cable or of any asbestos contaminant.

(c)Unless falling within Part A or B of this Section, the separation of copper, aluminium, magnesium or zinc from mixed scrap by differential melting.

Interpretation of Part C

In this Part “net rated thermal input” is the rate at which fuel can be burned at the maximum continuous rating of the appliance multiplied by the net calorific value of the fuel and expressed as megawatts thermal.

Interpretation of Section 2.2

1.  In this Section “non-ferrous metal alloy” means an alloy which is not a ferrous alloy, as defined in Section 2.1.

2.  Nothing in paragraphs (c) to (h) of Part A or in Part B or C of this Section shall be taken to refer to the activities of hand soldering, flow soldering or wave soldering.

SECTION 2.3SURFACE TREATING METALS AND PLASTIC MATERIALS
Part A

(a)Surface treating metals and plastic materials using an electrolytic or chemical process where the aggregated volume of the treatment vats is more than 30m3.

Part B

(a)Any process for the surface treatment of metal which is likely to result in the release into air of any acid-forming oxide of nitrogen and which does not fall within Part A of this Section.

Part C

Nil

Back to top

Options/Help

Print Options

You have chosen to open The Whole Rule

The Whole Rule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Rule as a PDF

The Whole Rule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Rule

The Whole Rule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources