SECTION 2.1FERROUS METALS
Part A

(a)Roasting or sintering metal ore, including sulphide ore, or any mixture of iron ore with or without other materials.

(b)Producing, melting or refining iron or steel or any ferrous alloy, including continuous casting, except where the only furnaces used are–

(i)electric arc furnaces with a designed holding capacity of less than 7 tonnes, or

(ii)cupola, crucible, reverbatory, rotary, induction or resistance furnaces.

(c)Processing ferrous metals and their alloys by using hot-rolling mills with a production capacity of more than 20 tonnes of crude steel per hour.

(d)Loading, unloading or otherwise handling or storing more than 500,000 tonnes in total in any period of 12 months of iron ore, except in the course of mining operations, or burnt pyrites.

(e)Producing pig iron or steel, including continuous casting, in a plant with a production capacity of more than 2.5 tonnes per hour unless falling within paragraph (b) of this Part of this Section.

(f)Operating hammers in a forge, the energy of which is more than 50 kilojoules per hammer, where the calorific power used is more than 20 megawatts.

(g)Applying protective fused metal coatings with an input of more than 2 tonnes of crude steel per hour.

(h)Casting ferrous metal at a foundry with a production capacity of more than 20 tonnes per day.

Part B

Casting iron, steel or any ferrous alloy from deliveries of 50 tonnes or more of molten metal, unless falling within Part A of this Section.

Part C

(a)Producing pig iron or steel, including continuous casting, in a plant with a production capacity of 2.5 tonnes or less per hour, unless falling within paragraph (b) of Part A of this Section.

(b)Producing, melting or refining iron or steel or any ferrous alloy (other than producing pig iron or steel, including continuous casting) using–

(i)one or more electric arc furnaces, none of which has a designed holding capacity of 7 tonnes or more; or

(ii)a cupola, crucible, reverberatory, rotary, induction or resistance furnace,

unless falling within paragraph (e) or (h) of Part A of this Section.

(c)Desulphurising iron, steel or any ferrous alloy.

(d)Heating iron, steel or any ferrous alloy (whether in a furnace or other appliance) to remove grease, oil or any other non-metallic contaminant (including such operations as the removal by heat of plastic or rubber covering from scrap cable) unless–

(i)it is carried out in one or more furnaces or other appliances the primary combustion chambers of which have in aggregate a rated thermal input of less than 0.2 megawatts;

(ii)it does not involve the removal by heat of plastic or rubber covering from scrap cable or of any asbestos contaminant; and

(iii)it is not related to any other activity falling within this Part of this Section.

Interpretation of Section 2.1

In this Section, “ferrous alloy” means an alloy of which iron is the largest constituent, or equal to the largest constituent, by weight, whether or not that alloy also has a non-ferrous metal content greater than any percentage specified in Section 2.2.

Back to top

Options/Help

Print Options

You have chosen to open The Whole Rule

The Whole Rule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Rule as a PDF

The Whole Rule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Rule

The Whole Rule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources