- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
Regulation 2(2)
1. In the Table below—
“area of the proposed works”, includes any area occupied by apparatus, equipment, machinery, materials, plant, spoil heaps or other facilities or stores required for construction or installation;
“floorspace”, means floorspace in a building or buildings;
“waterway” and “underground strata” have the meanings assigned to them by Section 30 of the Water Act (Northern Ireland) 1972(1).
2. The Table below sets out the descriptions of development and applicable thresholds and criteria for the purposes of classifying development as Schedule 2 development.
Column 1 | Column 2 |
---|---|
Description of development | Applicable threshold and criteria |
The carrying out of development to provide any of the following— | |
1. Agriculture and aquaculture | |
(a)Projects for the use of uncultivated land or semi-natural areas for intensive agricultural purposes; | The area of the development exceeds 0.5 hectare. |
(b)Water management projects for agriculture, including irrigation and land drainage projects; | The area of the works exceeds 1 hectare. |
(c)Intensive livestock installations (unless included in Schedule 1); | The area of new floorspace exceeds 500 square metres. |
(d)Intensive fish farming; | The installation resulting from the development is designed to produce more than 10 tonnes of dead weight fish per year. |
(e)Reclamation of land from the sea. | All development. |
2. Extractive industry | |
(a)Quarries, open-cast mining and peat extraction (unless included in Schedule 1); | All development (except the construction of buildings or other ancillary structures where the new floorspace does not exceed 1,000 square metres). |
(b)Underground mining; | |
(c)Extraction of minerals by fluvial dredging; | All development. |
(d)Deep drillings, in particular— (i)geothermal drilling; (ii)drilling for the storage of nuclear waste material; (iii)drilling for water supplies; with the exception of drillings for investigating the stability of the soil; | (i)In relation to any type of drilling the area of the proposed works exceeds 1 hectare; or (ii)in relation to geothermal drilling and drilling for storage of nuclear waste material only, drilling is to be undertaken within 100 metres of any waterway or water in underground strata. |
(e)Surface industrial installations for the extraction of coal, petroleum, natural gas and ores, as well as bituminous shale. | The area of the development exceeds 0.5 hectare. |
3. Energy industry | |
(a)Industrial installations for the production of electricity, steam and hot water (unless included in Schedule 1); | The area of the development exceeds 0.5 hectare. |
(b)Industrial installations for carrying gas, steam and hot water; | The area of the works exceeds 1 hectare. |
(c)Transmission of electrical energy by overhead cables (unless included in Schedule 1); | (i)The nominal voltage of the electric line exceeds 33 kV; and (ii)the purpose of the line is the provision of a supply to more than one consumer; (iii)where the modification of an existing line is proposed, it is outside the tolerances specified in the Overhead Lines (Exemption) Regulations (Northern Ireland) 1992 (S.R. 1992 No. 118). |
(d)Surface storage of natural gas; | (i)the area of any new building, deposit or structure exceeds 500 square metres; or |
(e)Underground storage of combustible gases; | (ii)a new building, deposit or structure is to be sited within 100 metres of any waterway or water in underground strata. |
(f)Surface storage of fossil fuels; | |
(g)Industrial briquetting of coal and lignite; | The area of new floor space exceeds 1,000 square metres. |
(h)Installations for the processing and storage of radioactive waste (unless included in Schedule 1); | (i)The area of new floorspace exceeds 1,000 square metres; or (ii)the installation resulting from the development will require an authorisation or the variation of an authorisation under the Radioactive Substances Act 1993. |
(i)Installations for hydroelectric energy production; | The installation is designed to produce more than 0.5 megawatts. |
(j)Installations for the harnessing of wind power for energy production (wind farms). | (i)the development involves the installation of more than 2 turbines; or (ii)he hub height of any turbine or height of any other structure exceeds 15 metres. |
4. Production and processing of metals | |
(a)Installations for the production of pig iron or steel (primary or secondary fusion) including continuous casting; | The area of new floorspace exceeds 1,000 square metres. |
(b)Installations for the processing of ferrous metals— (i)hot-rolling mills; (ii)smitheries with hammers; (iii)application of protective fused metal coats. | |
4. Production and processing of metals (continued) | |
(c)Ferrous metal foundries; | |
(d)Installations for the smelting, including the alloyage, of non-ferrous metals, excluding precious metals, including recovered products (refining, foundry casting, etc.); | |
(e)Installations for surface treatment of metals and plastic materials using an electrolytic or chemical process; | |
(f)Manufacture and assembly of motor vehicles and manufacture of motor-vehicle engines; | |
(g)Shipyards; | |
(h)Installations for the construction and repair of aircraft; | |
(i)Manufacture of railway equipment; | |
(j)Swaging by explosives; | |
(k)Installations for the roasting and sintering of metallic ores. | |
5. Mineral industry | |
(a)Coke ovens (dry coal distillation); | The area of new floorspace exceeds 1,000 square metres. |
(b)Installations for the manufacture of cement; | |
(c)Installations for the production of asbestos and the manufacture of asbestos-based products (unless included in Schedule 1); | |
(d)Installations for the manufacture of glass including glass fibre; | |
(e)Installations for smelting mineral substances including the production of mineral fibres; | |
(f)Manufacture of ceramic products by burning, in particular roofing tiles, bricks, refractory bricks, tiles, stoneware or porcelain. | |
6. Chemical industry (unless included in Schedule 1) | |
(a)Treatment of intermediate products and production of chemicals; | The area of new floorspace exceeds 1,000 square metres. |
(b)Production of pesticides and pharmaceutical products, paint and varnishes, elastomers and peroxides; | |
(c)Storage facilities for petroleum, petrochemical and chemical products. | (i)The area of any new building or structure exceeds 0.05 hectare; or (ii)more than 200 tonnes of petroleum, petrochemical or chemical products is to be stored at any one time. |
7. Food industry | |
(a)Manufacture of vegetable and animal oils and fats; | The area of new floorspace exceeds 1,000 square metres. |
(b)Packing and canning of animal and vegetable products; | |
(c)Manufacture of dairy products; | |
(d)Brewing and malting; | |
(e)Confectionery and syrup manufacture; | |
(f)Installations for the slaughter of animals; | |
(g)Industrial starch manufacturing installations; | |
(h)Fish-meal and fish-oil factories; | |
(i)Sugar factories. | |
8. Textile, leather, wood and paper industries | |
(a)Industrial plants for the production of paper and board (unless included in Schedule 1) | The area of new floorspace exceeds 1,000 square metres. |
(b)Plants for the pre-treatment (operations such as washing, bleaching, mercerisation) or dyeing of fibres or textiles; | |
(c)Plants for the tanning of hides and skins; | |
(d)Cellulose-processing and production installations. | |
9. Rubber industry | |
Manufacture and treatment of elastomer-based products. | The area of new floorspace exceeds 1,000 square metres. |
10. Infrastructure projects | |
(a)Industrial estate development projects; | The area of the development exceeds 0.5 hectare. |
(b)Urban development projects, including the construction of shopping centres and car parks; | |
(c)Construction of intermodal transshipment facilities and of intermodal terminals (unless included in Schedule 1); | |
(d)Construction of railways (unless included in Schedule 1); | The area of the works exceeds 1 hectare. |
(e)Construction of airfields (unless included in Schedule 1); | (i)The development involves an extension to a runway; or (ii)the area of the works exceeds 1 hectare. |
(f)Construction of roads (unless included in Schedule 1); | The area of the works exceeds 1 hectare. |
(g)Construction of harbours and port installations, including fishing harbours (unless included in Schedule 1); | The area of the works exceeds 1 hectare. |
(h)Inland-waterway construction (unless included in Schedule 1), canalisation and flood-relief works; | The area of the works exceeds 1 hectare. |
(i)Dams and other installations designed to hold water or store it on a long-term basis (unless included in Schedule 1); | |
(j)Tramways, elevated and underground railways, suspended lines or similar lines of a particular type, used exclusively or mainly for passenger transport; | |
(k)Oil and gas pipeline installations (unless included in Schedule 1); | (i)The area of the works exceeds 1 hectare; or |
(l)installations of long-distance aqueducts; | (ii)in the case of a gas pipeline, the installation has a design operating pressure exceeding 7 bar gauge. |
(m)Coastal work to combat erosion and maritime works capable of altering the coast through the construction, for example, of dykes, moles, jetties and other sea defence works, excluding the maintenance and reconstruction of such works; | All development. |
(n)Ground water abstraction and artificial ground water recharge schemes (unless included in Schedule 1); | The area of the works exceeds 1 hectare. |
(o)Works for the transfer of water resources between river basins (unless included in Schedule 1). | |
11. Other projects | |
(a)Permanent racing and test tracks for motorised vehicles; | The area of the development exceeds 1 hectare. |
(b)Installations for the disposal of waste (unless included in Schedule 1); | (i)The disposal is by incineration; or (ii)the area of the development exceeds 0.5 hectare; or (iii)the installation is to be sited within 100 metres of any waterway or water in underground strata or, marine waters. |
(c)Waste-water treatment plants (unless included in Schedule 1); | The area of the development exceeds 1,000 square metres. |
(d)Sludge-deposition sites; | (i)The area of the deposit or storage exceeds 0.5 hectare; or |
(e)Storage of scrap iron, including scrap vehicles; | (ii)a deposit is to be made or scrap stored within 100 metres of any waterway or water in underground strata or, marine waters. |
(f)Test benches for engines, turbines or reactors; | The area of new floorspace exceeds 1,000 square metres. |
(g)Installations for the manufacture of artificial mineral fibres; | |
(h)Installations for the recovery or destruction of explosive substances; | |
(i)Knackers' yards. | |
12. Tourism and leisure | |
(a)Ski-runs, ski-lifts and cable-cars and associated developments; | (i)The area of the works exceeds 1 hectare; or (ii)the height of any building or other structure exceeds 15 metres. |
(b)Marinas; | The area of the enclosed water surface exceeds 1,000 square metres. |
(c)Holiday villages and hotel complexes outside urban areas and associated developments; | The area of the development exceeds 0.5 hectare. |
(d)Theme parks; | |
(e)Permanent camp sites and caravan sites. | The area of the development exceeds 1 hectare. |
13. | |
(a)Any change to or extension of development of a description listed in Schedule 1 or in paragraphs 1 to 12 of Column 1 of this table, where that development is already authorised, executed or in the process of being executed, and the change or extension may have significant adverse effects on the environment; | (i)In relation to development of a description mentioned in Column 1 of this table, the thresholds and criteria in the corresponding part of Column 2 of this table applied to the change or extension (and not to the development as changed or extended). (ii)In relation to development of a description mentioned in a paragraph in Schedule 1 indicated below, the thresholds and criteria in Column 2 of the paragraph of this table indicated below applied to the change or extension (and not to the development as changed or extended): |
Paragraph in Schedule 1 | Paragraph of this table |
---|---|
1 | 6(a) |
2(a) | 3(a) |
2(b) | 3(h) |
3 | 3(h) |
4 | 4 |
5 | 5 |
6 | 6(a) |
7(a) | 10(d) (in relation to railways) or 10(e) (in relation to airports). |
7(b) and (c) | 10(f) |
8(a) | 10(h) |
8(b) | 10(g) |
9 | 11(b) |
10 | 11(b) |
11 | 10(n) |
12 | 10(o) |
13 | 11(c) |
14 | 2(e) |
15 | 10(i) |
16 | 10(k) |
17 | 1(c) |
18 | 8(a) |
19 | 2(a) |
20 | 3(c) |
21 | 6(c) |
(b)Development of a description in Schedule 1, undertaken exclusively or mainly for the development and testing of new methods or products and not used for more than two years. | All development. |
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: