SCHEDULE 4N.I.DESCRIPTION OF CANAL WORKS, ETC.

Modifications etc. (not altering text)

C1Schs. 3-5: transfer of functions (8.5.2016 for specified purposes) by The Departments (Transfer of Functions) Order (Northern Ireland) 2016 (S.R. 2016/76), art. 1(2), Sch. 3 Pt. 2 (with art. 9(2))

3.  New construction, including—N.I.

(a)the diversion of waterways;

(b)the cutting through of “U” or “S” bends so as to straighten and shorten the channel;

(c)the construction of new waterways, and of new outfall channels to existing main drains and their feeders;

(d)the construction, alteration, restoration or improvement of any quay, harbour, mooring, dry dock, fish pass, slipway, navigation aid, towing path, culvert, overflow culvert, pipe, drain or road (other than a road within the meaning of the [1993 NI 15.] Roads (Northern Ireland) Order 1993);

(e)the provision of such buildings as the Department considers appropriate in connection with any works described in this Schedule;

(f)the reconstruction and improvement of bridges, locks, overflows, weirs, hatches and outfalls necessitating structural alterations;

(g)the reconstruction of damaged or inadequate bridges and culverts, and the substitution of new bridges and culverts therefor;

(h)the building of embankments and walls for the prevention of flooding or erosion;

(i)the formation of cattle water-places, sheep-dipping and other conveniences, the provision of which is calculated to minimise the risk of future damage to any specified canal which has been improved.