Search Legislation

High Speed Rail (London - West Midlands) Act 2017

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: SCHEDULE 16

 Help about opening options

Changes to legislation:

There are currently no known outstanding effects for the High Speed Rail (London - West Midlands) Act 2017, SCHEDULE 16. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Section 15

SCHEDULE 16U.K.Temporary possession and use of land

This schedule has no associated Explanatory Notes

Part 1 U.K.Temporary possession for construction of works

Right to enter upon and take possession of landU.K.

1(1)The nominated undertaker may enter upon and take possession of the land specified in the table in Part 4 of this Schedule—U.K.

(a)for the purpose specified in relation to the land in column (3) of the table in connection with the authorised works specified in column (4) of the table,

(b)for the purpose of constructing such works as are mentioned in column (5) of the table in relation to the land, or

(c)otherwise for Phase One purposes.

(2)The nominated undertaker may (subject to paragraph 2(1)) enter upon and take possession of any other land within the Act limits for Phase One purposes.

(3)The reference in sub-paragraph (1)(a) to the authorised works specified in column (4) of the table includes a reference to any works which are necessary or expedient for the purposes of or in connection with those works.

ExceptionsU.K.

2(1)Paragraph 1(2) does not apply in relation to—U.K.

(a)land which is subject to a restricted power of compulsory acquisition,

(b)land in respect of which a notice of entry has been served under section 11 of the Compulsory Purchase Act 1965 (as applied by section 4(3) to the acquisition of land under section 4(1)), other than in connection with the acquisition of rights or subsoil only or the imposition of a restrictive covenant, or

(c)land in respect of which a declaration has been made under section 4 of the Compulsory Purchase (Vesting Declarations) Act 1981 (as applied by section 4(4) to the acquisition of land under section 4(1)), other than in connection with the acquisition of rights or subsoil only or the imposition of a restrictive covenant.

(2)The power under section 4(1) (power to acquire land compulsorily) is not exercisable in relation to land specified in the table in Part 4 of this Schedule.

(3)But sub-paragraph (2) does not apply in relation to land specified in the table to the extent (if any) that—

(a)the land is subject to a restricted power of compulsory acquisition, or

(b)there is power by virtue of section 5(3) to impose restrictive covenants over the land.

(4)For the purposes of this Schedule, land is subject to a restricted power of compulsory acquisition if the power under section 4(1) may be exercised in relation to the land only—

(a)so as to acquire rights relating to the land (see section 5(4)),

(b)so as to acquire the subsoil or under-surface of the land or so as to acquire rights of passage over the land (see paragraphs 1 and 2 of Schedule 11),

(ignoring any power by virtue of section 5(3) to impose restrictive covenants over the land).

Powers exercisable on land of which temporary possession has been takenU.K.

3(1)Where under paragraph 1(1) or (2) the nominated undertaker has entered upon and taken possession of land, the nominated undertaker may, for the purposes of or in connection with the construction of the works authorised by this Act—U.K.

(a)remove any structure or vegetation from the land,

(b)construct such works as are mentioned in relation to the land in column (5) of the table in Part 4 of this Schedule,

(c)construct temporary works (including the provision of means of access) and structures on the land, and

(d)construct landscaping and other works on the land to mitigate any adverse effects of the construction, maintenance or operation of the works authorised by this Act.

(2)The other works referred to in sub-paragraph (1)(d) include works involving the planting of trees and shrubs and the provision of replacement habitat for wild animals.

(3)In this paragraph, “"structure”” includes any erection.

Procedure and compensationU.K.

4(1)Not less than 28 days before entering upon and taking possession of land under paragraph 1(1) or (2), the nominated undertaker must give notice to the owners and occupiers of the land of its intention to do so.U.K.

(2)The nominated undertaker may not, without the agreement of the owners of the land, remain in possession of land under paragraph 1(1) or (2) after the end of the period of one year beginning with the date of completion of the work for which temporary possession of the land was taken.

(3)Sub-paragraph (2) does not apply, in the case of land mentioned in paragraph 1(2), if before the end of the one-year period either of the following powers has been exercised in relation to the land—

(a)the power to serve a notice to treat under Part 1 of the Compulsory Purchase Act 1965 (as applied by section 4(3) of this Act to the acquisition of land under section 4(1));

(b)the power to execute a declaration under section 4 of the Compulsory Purchase (Vesting Declarations) Act 1981 (as applied by section 4(4) of this Act to the acquisition of land under section 4(1)).

(4)The nominated undertaker must pay compensation to the owners and occupiers of land of which possession is taken under paragraph 1(1) or (2) for any loss which they may suffer by reason of the exercise in relation to the land of the power or powers under that paragraph.

(5)Any dispute as to a person's entitlement to compensation under sub-paragraph (4), or as to the amount of compensation, must be determined under and in accordance with Part 1 of the Land Compensation Act 1961.

(6)Nothing in this paragraph affects any liability to pay compensation under section 10(2) of the Compulsory Purchase Act 1965 (as applied by section 4(3) to the acquisition of land under section 4(1)) or under any other enactment, otherwise than for loss for which compensation is payable under sub-paragraph (4).

5(1)Before giving up possession of land of which possession has been taken under paragraph 1(1) or (2), the nominated undertaker must, in accordance with a scheme agreed with the owners of the land and the relevant planning authority, put the land into such condition as the scheme may provide.U.K.

(2)If no scheme has been agreed for the purposes of this paragraph within 6 months of the date of completion mentioned in paragraph 4(2) in relation to the land, the scheme is to be such as may be determined by the appropriate Ministers after consulting the nominated undertaker, the owners of the land and the relevant planning authority.

(3)Unless the owners of the land and the nominated undertaker otherwise agree, a scheme determined under sub-paragraph (2) must provide for land to be restored to its former condition.

(4)Sub-paragraph (3) does not require land on which works referred to in paragraph 1(1)(b) or 3(1)(d) have been constructed to be restored to its former condition.

(5)Unless the nominated undertaker otherwise agrees, a scheme determined under sub-paragraph (2) may not provide for the nominated undertaker to replace a structure removed under paragraph 3, other than a fence.

(6)Where the appropriate Ministers ask the relevant planning authority for assistance in connection with the carrying out by them of their function under sub-paragraph (2), they may require the nominated undertaker to reimburse to the relevant planning authority any expenses which it reasonably incurs in meeting the request.

(7)The duty under sub-paragraph (1) in relation to any land is owed separately to the owners of the land and to the relevant planning authority.

(8)Where a scheme for the purposes of this paragraph provides for any step to be taken by the nominated undertaker before a specified date and that step has not been taken before that date, the relevant planning authority may—

(a)enter the land concerned and take that step, and

(b)require the nominated undertaker to reimburse to it any expenses which it reasonably incurs in acting under paragraph (a).

(9)In this paragraph—

  • "appropriate Ministers”” means the Secretary of State for [F1Levelling Up, Housing and Communities] and the Secretary of State for Transport and, in relation to the carrying out of any function, means those Ministers acting jointly;

  • "relevant planning authority”” means the unitary authority or, in a non-unitary area, the district council in whose area the land is situated.

(10)But where—

(a)the unitary authority in whose area the land is situated is a London borough council, and

(b)as a result of a Localism Act TCPA order, a Mayoral development corporation is the local planning authority for the purposes of Part 3 of the Town and Country Planning Act 1990 for that area,

the relevant planning authority is the Mayoral development corporation instead of the London borough council.

6(1)The Secretary of State may make regulations modifying the operation of this Part of this Schedule—U.K.

(a)in consequence of an order under section 198(2) of the Localism Act 2011 giving effect to a decision under section 204(2) of that Act (decision removing or restricting planning functions), or

(b)to make transitional provision relating to—

(i)an order mentioned in paragraph (a),

(ii)a Localism Act TCPA order, or

(iii)an order under section 217 of the Localism Act 2011 (order dissolving Mayoral development corporation).

(2)Regulations under this paragraph—

(a)must be made by statutory instrument;

(b)may make different provision for different purposes.

(3)A statutory instrument containing regulations under this paragraph is subject to annulment in pursuance of a resolution of either House of Parliament.

Part 2 U.K.Temporary possession for maintenance of works

Right to enter upon and take possession of landU.K.

7(1)At any time during the maintenance period relating to any of the scheduled works, the nominated undertaker may—U.K.

(a)enter upon and take possession of any land which is—

(i)within 20 metres from that work, and

(ii)within the Act limits,

if possession of the land is reasonably required for the purposes of or in connection with maintaining the work or any ancillary works connected with it, and

(b)construct on the land such temporary works (including the provision of means of access) and structures as may be reasonably so required, unless the land is specified in the table in Part 4 of this Schedule.

(2)Sub-paragraph (1) does not authorise the nominated undertaker to take possession of—

(a)a house, any other structure which is for the time being occupied, or a garden belonging to a house, or

(b)land which is subject to a restricted power of compulsory acquisition.

(3)The nominated undertaker may only remain in possession of the land for so long as may be reasonably required to carry out the maintenance works for which possession of the land was taken.

(4)In this paragraph—

(a)"the maintenance period””, in relation to any work, means the period beginning with the date on which the work is completed and ending 5 years after the date on which it is brought into general use;

(b)"structure”” includes any erection;

(c)the reference in sub-paragraph (1)(a) to land within a specified distance of a work includes, in the case of a work under the surface of the ground, a reference to land within the specified distance of any point on the surface below which the work is situated.

Procedure and compensationU.K.

8(1)Not less than 28 days before entering upon and taking possession of land under paragraph 7, the nominated undertaker must give notice to the owners and occupiers of the land of its intention to do so.U.K.

(2)Before giving up possession of the land, the nominated undertaker must restore the land to the reasonable satisfaction of its owners.

(3)The nominated undertaker must pay compensation to the owners and occupiers of the land for any loss which they may suffer by reason of the exercise in relation to the land of the powers under paragraph 7.

(4)Any dispute as to a person's entitlement to compensation under sub-paragraph (3), or as to the amount of compensation, must be determined under and in accordance with Part 1 of the Land Compensation Act 1961.

(5)Nothing in this paragraph affects any liability to pay compensation under section 10(2) of the Compulsory Purchase Act 1965 (as applied by section 4(3) of this Act to the acquisition of land under section 4(1)), or under any other enactment, otherwise than for loss for which compensation is payable under sub-paragraph (3).

Part 3 U.K.Suspension of rights and enforcement

Suspension of rights relating to landU.K.

9(1)All private rights over land of which the nominated undertaker takes possession under paragraph 1 (1) or (2) or 7 are suspended and unenforceable for as long as the nominated undertaker remains in lawful possession of the land.U.K.

(2)The nominated undertaker may, in relation to a private right, direct—

(a)that sub-paragraph (1) does not apply to the right, or

(b)that sub-paragraph (1) applies to the right only to the extent specified in the direction.

(3)In this paragraph, ““private rights”” include—

(a)private rights of way over land,

(b)rights of common,

(c)easements, liberties, privileges, rights or advantages annexed to land and adversely affecting other land, including any natural right to support, and

(d)restrictions as to the user of land arising under a contract.

(4)Any person who suffers loss by reason of the suspension of a right under sub-paragraph (1) is entitled to be compensated by the nominated undertaker.

(5)Any dispute as to a person's entitlement to compensation under sub-paragraph (4), or as to the amount of compensation, must be determined under and in accordance with Part 1 of the Land Compensation Act 1961.

(6)This paragraph applies to a private right which is for the benefit of Crown land if the Crown authority consents (and consent may be subject to conditions).

10(1)All general rights over land of which the nominated undertaker takes possession under paragraph 1 (1) or (2) or 7 are suspended and unenforceable for as long as the nominated undertaker remains in lawful possession of the land.U.K.

(2)The nominated undertaker may, in relation to a general right, direct—

(a)that sub-paragraph (1) does not apply to the right, or

(b)that sub-paragraph (1) applies to the right only to the extent specified in the direction.

(3)In this paragraph, references to ““general rights”” over land are to—

(a)rights to access land (however expressed) which are exercisable as a result of section 2(1) of the Countryside and Rights of Way Act 2000 or an enactment mentioned in section 15 of that Act,

(b)other public rights over land which are conferred by an enactment, and

(c)rights exercisable as a result of trusts or incidents to which a common, town or village green, open space or allotment is subject.

EnforcementU.K.

11(1)Section 13 of the Compulsory Purchase Act 1965 (refusal to give possession to acquiring authority) applies for the purposes of this Schedule as if—U.K.

(a)references to the acquiring authority were to the nominated undertaker,

(b)references to compensation payable to the person refusing to give possession were to compensation payable under this Schedule, and

(c)in subsection (1), for ““this Act”” there were substituted “ Schedule 16 to the High Speed Rail (London - West Midlands) Act 2017 ”.

(2)In the case of Crown land, that section does not, by virtue of sub-paragraph (1), apply as against the Crown authority for that land.

Part 4 U.K.Land which may be occupied and used for construction of works

(1)(2)(3)(4)(5)
AreaNumber of land shown on deposited plansPurpose for which temporary possession may be takenSpecified authorised worksSpecified works which may be carried out
London Borough of Camden192, AP3-27Provision of worksite and access for construction1/18
291 to 305307, 308Provision of access for utility works1/1
312, 313, 314, 317, 346, 350 to 360, 771 to 776Diversion or installation of, or works to, utilities apparatus1/1
705, 706, 708Diversion or installation of, or works to, utilities apparatus1/15
London Borough of Brent22, 24, 30, 31, 34, 44, 45, 67, 71, 73, 382, 390 to 393Diversion or installation of, or works to, utilities apparatus1/15
60, 61, 114, 118, 121Diversion or installation of, or works to, utilities apparatus1/1
82, 85Diversion or installation of, or works to, utilities apparatus1/21
AP2-2Provision of access for utility works1/52
AP4-15aProvision of worksite and access for construction1/1
London Borough of Hammersmith & Fulham15Diversion or installation of, or works to, utilities apparatus1/1
24, 25a, 25bDiversion or installation of, or works to utilities apparatus1/15
London Borough of Ealing23Diversion or installation of, or works to, utilities apparatus1/40
878, 879Provision of worksite and access for construction1/1
Diversion or installation of, or works to, utilities apparatus
473, 475, 478, 479, 481, 482, 485, 488, 513 to 516, 527 to 535, 537 to 539, 543, 546, 549, 552, 554, 559, 563 to 566, 568 to 578, 690, 701, 881 to 883, 965, 966, 983Diversion or installation of, or works to, utilities apparatus1/1
676 to 682Diversion or installation of, or works to, utilities apparatus1/15
708, 954Provision of worksite and access for construction
871, 873, 874Worksite and access for construction1/55
Diversion or installation of, or works to, utilities apparatus
1028, 1029, 1031 to 1034Provision worksite and access for constructionDiversion or installation of, or works to, utilities apparatus
Provision of environmental mitigation
London Borough of Hillingdon34, 187 to 189, 249, 254Provision of access for utility worksDiversion or installation of, or works to, utilities apparatus
59, 60, 76, 174Provision of worksite and access for constructionDiversion or installation of, or works to, utilities apparatus
81, 82, 83, 86,144 to 147, 222, 226, 228,250, 252, 253Diversion or installation of, or works to utilities apparatus1/15
157, 159, 161, 162Provision of worksite and access for construction1/57
372 to 375, 380 to 383Diversion or installation of, or works to, utilities apparatus1/1 and 1/15
720eProvision of access for constructionProvision of environmental mitigation
598, 602, 681, 682, 684 to 687, 689 to 691Diversion and installation of overhead electric lines2/1
703a, 703b,704 to 706747c, 750Provision of worksite and access for construction2/1
720a, AP5-15 to AP5-20Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
733Diversion or installation of, or works to utilities apparatus2/1
County of Buckinghamshire District of South Bucks Parish of Denham4, 5, 5a, 6Provision of worksite and access for constructionProvision of environmental mitigation
9, 10, 13Provision of worksite and access for construction2/5
20Provision of worksite and access for construction2/6
County of Hertfordshire District of Three Rivers118Provision of worksite and access for construction2/10a
County of Buckinghamshire District of Chiltern Parish of Chalfont St Peter15, 17, 18, 20Provision of worksite and access for construction2/1
73Provision of access for construction
Parish of Chalfont St Giles1, 3Provision of access for construction
9, 46, 59, 93 to 95, 99, 101, 102Provision of protective works to watercourse2/1Protective works to watercourse
Parish of AmershamAP4-1, AP4-3Reprofiling of ground2/1Reprofiling of ground
40, 58Dewatering operations2/1Dewatering operations
61Provision of access for site investigation2/1
75Provision of access for construction2/1
Parish of Great MissendenAP4-16, AP4-17Provision of worksite and access for construction2/14
District of Aylesbury Vale Parish of Wendover105, 106, AP1-2 to AP1-7, AP1-9Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
107, AP1-1, AP1-8Implementation of protective measures for land beneath overhead line worksDiversion and installation of overhead electric lines
200, 201Diversion and installation of overhead electric lines2/28
District of Wycombe Parish of Ellesborough1, 3, 7, 9, 29, 31, 43, AP1-2, AP1-3Diversion and installation of overhead electric lines2/28
District of Aylesbury Vale Parish of Stoke Mandeville1 to 3118a, 121Diversion and installation of overhead electric lines2/28
Parish of Stone with Bishopstone and Hartwell2, 5, 12Diversion and installation of overhead electric lines2/28
AP5-1, AP5-2Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
Parish of Aylesbury4, 7 to 14, 16, 17, 19, 25 to 27, AP1-1 to AP1-3Implementation of protective measures for land beneath overhead line worksDiversion and installation of overhead electric lines
Parish of Waddesdon12, 22, 23Reprofiling of ground
99Removal of utility apparatus2/49
Parish of Quainton15, 26, 28, 30, 34Removal of utility apparatus
236, 238, 242, AP1-2, AP1-3, AP1-6 to AP1-14, AP1-21Diversion and installation of overhead electric lines
Parish of Grendon UnderwoodAP1-10, AP1-11Diversion and installation of overhead electric lines
AP5-1, AP5-2Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
Parish of Hogshaw3 to 6, 8, 13, 15, 16Diversion and installation of overhead electric lines
AP5-1Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
Parish of Steeple Claydon104Provision of access for construction
Provision of new public right of way
Parish of Chetwode61, 81, 82Removal of utility apparatus2/49
County of Oxfordshire District of Cherwell Parish of Newton Purcell with Shelswell69a, 87Removal of utility apparatus
89 to 91Provision of new public right of way
Parish of Finmere1 to 3Provision of new public right of way
20, 27b, 43a, 44, AP1-5, AP1-7Removal of utility apparatus
50, 53, 61 to 66, 69, 70Diversion and installation of overhead electric lines
67 and 68Provision of access for utility works
Parish of Mixbury30, 58, 59, 61Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
45aProvision of new public right of way2/49
55, 65Removal of utility apparatus2/49
County of Buckinghamshire District of Aylesbury Vale Parish of Westbury2 to 4, 15 to 17Removal of utility apparatus2/49
10 to 13Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
Parish of Turweston1, 1a, 2, 2a, 3a, 4a, 5a, 6a, 7a, 8a, 10a, 11a, 34, 92, 93Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
22, 23, 26, 27aRemoval of utility apparatus2/49
County of Northamptonshire District of South Northamptonshire Parish of Evenly2 to 5Diversion and installation of overhead electric lines
Parish of Greatworth2, 8a, 40, 41Provision of new public right of way2/111
12a, 37, 45Removal of utility apparatus2/111
AP2-4Provision of temporary public right of way1/52
Parish of Thorpe Manderville34, 37, 38Removal of utility apparatus2/111
Parish of Culworth3Removal of utility apparatus2/111
Parish of Chipping Warden and Edgcote42, 55, 56, 70Removal of utility apparatus2/111
102Provision of new public right of way2/128b
Parish of Aston Le Walls12Provision of new public right of way2/111
Parish of Boddington5Provision of new public right of way2/111
21Diversion or installation of, or works to, utilities apparatus2/129
44, 79, 83, 84, 100, 102Removal of utility apparatus2/111
County of Warwickshire District of Stratford-on-Avon Parish of Wormleighton33Reprofiling of ground2/133Reprofiling of ground
37Provision of worksite and access for construction2/137
41Provision of worksite and access for construction2/133
45, 51, 57Provision of worksite and access for construction2/133Reprofiling of ground
Reprofiling of ground
Parish of Stoneton23Provision of worksite and access for construction and maintenance2/133
26Provision of worksite and access for construction and maintenance2/133Provision of environmental mitigation
Parish of Radbourn17, 27Provision of worksite and access for construction2/139
4Provision of worksite and access for construction2/133Reprofiling of ground
Reprofiling of ground
Parish of Ladbroke4, 11Provision of worksite and access for construction2/133Reprofiling of ground
Reprofiling of ground
Parish of Southam20Provision of worksite and access for construction2/142c
District of Warwick Parish of Offchurch14, 16Provision of worksite and access for construction2/146Reprofiling of ground
Reprofiling of ground
46Reprofiling of ground2/146Reprofiling of ground
72Provision of access for construction and maintenance2/146
Parish of Cubbington8Provision of balancing pond and associated works and access for maintenanceProvision of balancing pond and associated works and access for maintenance
63Provision of worksite and access for construction2/163
Parish of Stoneleigh30, 46Removal of utility apparatusUtility diversion
156Provision of environmental mitigation2/175
Parish of Burton Green36Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
Metropolitan Borough of Solihull Parish of Berkswell19a, 19b, 20 to 22, 23a, 27a, 29aDiversion and installation of overhead electric linesDiversion and installation of overhead electric lines
18b, 30bProvision of access for utility worksDiversion and installation of overhead electric lines
AP4-1Provision of access for utility works
Parish of Chelmsley Wood10, 16, 70Provision of worksite and access for construction3/25
19 to 63, 65, 66, 68Implementation of protective measures for land beneath overhead line worksDiversion and installation of overhead electric lines
Parish of Hampton-in-ArdenAP4-1, AP4-2Provision of a temporary parking facility
County of Warwickshire District of North Warwickshire Parish of Coleshill1dProvision of access for utility worksDiversion and installation of overhead electric lines
72, 76, 79, 80, 81, 82, 84, 86, 88, 112a, 261, 262, 265, 273, 307, 311, 356Provision of access for utility worksDiversion and installation of overhead electric lines
418Reprofiling of groundReprofiling of ground
Removal of utility apparatus
421, 423, 426, 429Implementation of protective measures for land beneath overhead line worksDiversion and installation of overhead electric lines
AP1-1 to AP1-10Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
Parish of Curdworth20, 198, 207, 232, AP4-34 to AP4-36, AP4-38Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
53Implementation of protective measures for land beneath overhead line worksDiversion and installation of overhead electric lines
124, 158Provision of worksite and access for construction3/36
AP1-9 to AP1-11Provision of worksite and access for construction3/45A
Parish of Lea MarstonAP4-7 to AP4-9Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
Parish of Wishaw and Moxhull4, 6c, 7, 9a, 10, AP1-6 to AP1-10Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
AP1-2Provision of worksite and access for construction3/45A
Parish of Middleton14, AP1-1 to AP1-3, AP1-4a, AP1-5 to AP1-7, AP1-12, AP2-23, AP2-26, AP2-27Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
36, 64Removal of utility apparatus3/48A
68aProvision of access for utility works3/50a
86Reprofiling of ground3/48AReprofiling of ground
25a, AP1-4aDiversion and installation of overhead electric lines
Access for construction
37bRemoval of utility apparatus3/48A
County of Staffordshire District of Lichfield Parish of Drayton Bassett91, 125, 121, 126, 127, AP1-1 to AP1-9Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
Parish of Fazeley1Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
Parish of Hints32, 34, 36, 40 to 44, 46Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
136 to 138Removal of utility apparatusDiversion or installation of, or works to, utilities apparatus
Parish of Weeford1, 2, 3a, 4, AP1-2, AP5-1Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
Parish of Swinfen and Packington13a, AP2-3Provision of access for construction3/48A
AP1-1, AP1-2Implementation of protective measures for land beneath overhead line worksDiversion and installation of overhead electric lines
Parish of LichfieldAP4-4 to AP4-10Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
5Provision of worksite and access for construction3/112
Parish of Fradley and StreethayAP4-1, AP4-2Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
139Provision of worksite and access for construction3/112
Parish of Curborough and Elmhurst4, 5, AP4-1, AP4-2, AP4-10 to AP4-12Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
Parish of Longdon12b, AP1-1a, AP1-2a, AP5-1, AP5-2Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
Parish of King's Bromley153Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines
Parish of Armitage with Handsacre21, 22Provision of worksite and access for construction3/106
Parish of Mavesyn Ridware1, 2, 3, 4Provision of worksite and access for constructionInstallation of signal gantriesInstallation of signal gantries
2aInstallation of signal gantriesInstallation of signal gantriesInstallation of signal gantries
Parish of Colton1, 20Provision of worksite and access for constructionInstallation of signal gantriesInstallation of signal gantries
2, 3, 5, 6, 8, 13, 14, 19, 21, 22Provision of worksite and access for constructionInstallation of signal gantries
County of Staffordshire Borough of Stafford Parish of Colwich1, 3, 7, 9Provision of worksite and access for constructionInstallation of signal gantriesInstallation of signal gantries
7a, 2, 4, 5, 6, 8, 19a, 20, 21, 22, 23, 26, AP2-2 to AP2-6Provision of worksite and access for constructionInstallation of signal gantries
Metropolitan Borough of Solihull Parish of Bickenhill3bProvision of access for utility worksDiversion and installation of overhead electric lines
38Provision of worksite and access for constructionDiversion and installation of overhead electric linesDiversion and installation of overhead electric lines
41aDiversion and installation of overhead electric linesDiversion and installation of overhead electric lines
County of Warwickshire District of North Warwickshire Parish of Little Packington6aProvision of access for utility worksDiversion and installation of overhead electric lines
City of Birmingham57, 59, 61Diversion or installation of, or works to, utilities apparatus3/200
172, 174, 176Provision of worksite and access for construction3/207
191Use of sidings3/205
300Provision of worksite and access for constructionDiversion and installation of overhead electric linesDiversion and installation of overhead electric lines
412Provision of drainage and associated worksHighway worksProvision of drainage and associated works
446, 451Provision of worksite and access for constructionDiversion and installation of overhead electric lines3/205Diversion and installation of overhead electric lines
AP4-3 to AP4-7, AP4-11 to AP4-19Diversion and installation of overhead electric linesDiversion and installation of overhead electric lines

Back to top

Options/Help

Print Options

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Notes

Text created by the government department responsible for the subject matter of the Act to explain what the Act sets out to achieve and to make the Act accessible to readers who are not legally qualified. Explanatory Notes were introduced in 1999 and accompany all Public Acts except Appropriation, Consolidated Fund, Finance and Consolidation Acts.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources