Search Legislation

Directive 2008/57/EC of the European Parliament and of the Council (repealed)Show full title

Directive 2008/57/EC of the European Parliament and of the Council of 17 June 2008 on the interoperability of the rail system within the Community (Recast) (Text with EEA relevance) (repealed)

 Help about what version

What Version

 Help about opening options

Opening OptionsExpand opening options

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Status:

EU Directives are published on this site to aid cross referencing from UK legislation. Since IP completion day (31 December 2020 11.00 p.m.) no amendments have been applied to this version.

  1. Introductory Text

  2. CHAPTER I GENERAL PROVISIONS

    1. Article 1.Purpose and scope

    2. Article 2.Definitions

    3. Article 3.Overall compatibility

    4. Article 4.Essential requirements

  3. CHAPTER II TECHNICAL SPECIFICATIONS FOR INTEROPERABILITY

    1. Article 5.Content of TSIs

    2. Article 6.Adoption, review and publication of TSIs

    3. Article 7.Deficiencies in TSIs

    4. Article 8.Extension of the scope of TSIs

    5. Article 9.Derogations

  4. CHAPTER III INTEROPERABILITY CONSTITUENTS

    1. Article 10.Placing on the market of interoperability constituents

    2. Article 11.Conformity or suitability for use

    3. Article 12.Non-compliance of European specification with essential requirements

    4. Article 13.Procedure for ‘EC’ declaration of conformity or suitability for use

    5. Article 14.Non-compliance of interoperability constituents with essential requirements

  5. CHAPTER IV SUBSYSTEMS

    1. Article 15.Procedure for placing in service

    2. Article 16.Free movement of subsystems

    3. Article 17.Conformity with TSIs and national rules

    4. Article 18.Procedure for establishing the ‘EC’ declaration of verification

    5. Article 19.Non-compliance of subsystems with essential requirements

    6. Article 20.Placing in service of existing subsystems after renewal or upgrading

  6. CHAPTER V VEHICLES

    1. Article 21.Authorisation for placing in service of vehicles

    2. Article 22.First authorisation for placing in service of TSI conform vehicles

    3. Article 23.Additional authorisations for placing in service of TSI conform vehicles

    4. Article 24.First authorisation for placing in service of non-TSI conform vehicles

    5. Article 25.Additional authorisations for placing in service of non-TSI conform vehicles

    6. Article 26.Authorisation for types of vehicles

    7. Article 27.Classification of national rules

  7. CHAPTER VI NOTIFIED BODIES

    1. Article 28.Notified bodies

  8. CHAPTER VII COMMITTEE AND WORK PROGRAMME

    1. Article 29.Committee procedure

    2. Article 30.Complementary tasks

    3. Article 31.Work programme

  9. CHAPTER VIII REGISTERS OF NETWORK AND VEHICLES

    1. Article 32.Vehicle numbering system

    2. Article 33.National vehicle registers

    3. Article 34.European register of authorised types of vehicles

    4. Article 35.Register of infrastructure

  10. CHAPTER IX TRANSITIONAL PROVISIONS

    1. Article 36.Draft reference systems

  11. CHAPTER X FINAL PROVISIONS

    1. Article 37.Motivation

    2. Article 38.Transposition

    3. Article 39.Reports and information

    4. Article 40.Repeal

    5. Article 41.Entry into force

    6. Article 42.Addressees

    1. Expand +/Collapse -

      ANNEX I

      SCOPE

      1. 1. Trans-European conventional rail system

        1. 1.1. Network

        2. 1.2. Vehicles

      2. 2. Trans-European high-speed rail system

        1. 2.1. Network

        2. 2.2. Vehicles

      3. 3. Compatibility of the railway system

      4. 4. Extension of the scope

        1. 4.1. Subcategories of network and vehicles

        2. 4.2. Cost safeguards

    2. Expand +/Collapse -

      ANNEX II

      SUBSYSTEMS

      1. 1. List of subsystems

      2. 2. Description of the subsystems

        1. 2.1. Infrastructure

        2. 2.2. Energy

        3. 2.3. Trackside control-command and signalling

        4. 2.4. On-board control-command and signalling

        5. 2.5. Operation and traffic management

        6. 2.6. Telematics applications

        7. 2.7. Rolling stock

        8. 2.8. Maintenance

    3. Expand +/Collapse -

      ANNEX III

      ESSENTIAL REQUIREMENTS

      1. 1. General requirements

        1. 1.1. Safety

          1. 1.1.1. . . . . . . . . . ....

          2. 1.1.2. . . . . . . . . . ....

          3. 1.1.3. . . . . . . . . . ....

          4. 1.1.4. . . . . . . . . . ....

          5. 1.1.5. . . . . . . . . . ....

        2. 1.2. Reliability and availability

        3. 1.3. Health

          1. 1.3.1. . . . . . . . . . ....

          2. 1.3.2. . . . . . . . . . ....

        4. 1.4. Environmental protection

          1. 1.4.1. . . . . . . . . . ....

          2. 1.4.2. . . . . . . . . . ....

          3. 1.4.3. . . . . . . . . . ....

          4. 1.4.4. The design and operation of the rail system must not...

          5. 1.4.5. . . . . . . . . . ....

        5. 1.5. Technical compatibility

        6. 1.6. Accessibility

          1. 1.6.1. . . . . . . . . . ....

          2. 1.6.2. . . . . . . . . . ....

      2. 2. Requirements specific to each subsystem

        1. 2.1. Infrastructure

          1. 2.1.1. Safety

          2. 2.1.2. Accessibility

            1. 2.1.2.1. . . . . . . . . . ....

        2. 2.2. Energy

          1. 2.2.1. Safety

          2. 2.2.2. Environmental protection

          3. 2.2.3. Technical compatibility

        3. 2.3. Control-command and signalling

          1. 2.3.1. Safety

          2. 2.3.2. Technical compatibility

        4. 2.4. Rolling stock

          1. 2.4.1. Safety

          2. 2.4.2. Reliability and availability

          3. 2.4.3. Technical compatibility

          4. 2.4.4. Controls

          5. 2.4.5. Accessibility

            1. 2.4.5.1. . . . . . . . . . ....

        5. 2.5. Maintenance

          1. 2.5.1. Health and safety

          2. 2.5.2. Environmental protection

          3. 2.5.3. Technical compatibility

        6. 2.6. Operation and traffic management

          1. 2.6.1. Safety

          2. 2.6.2. Reliability and availability

          3. 2.6.3. Technical compatibility

          4. 2.6.4. Accessibility

            1. 2.6.4.1. . . . . . . . . . ....

        7. 2.7. Telematics applications for freight and passengers

          1. 2.7.1. Technical compatibility

          2. 2.7.2. Reliability and availability

          3. 2.7.3. Health

          4. 2.7.4. Safety

          5. 2.7.5. Accessibility

            1. 2.7.5.1. . . . . . . . . . ....

    4. Expand +/Collapse -

      ANNEX IV

      ‘EC’ DECLARATION OF CONFORMITY AND SUITABILITY FOR USE OF INTEROPERABILITY CONSTITUENTS

      1. 1. Interoperability constituents

        1. 1.1. Multiple-use constituents

        2. 1.2. Multiple-use constituents having specific characteristics

        3. 1.3. Specific constituents

      2. 2. Scope

      3. 3. Contents of the ‘EC’ declaration

    5. Expand +/Collapse -

      ANNEX V

      ‘EC’ DECLARATION OF VERIFICATION OF SUBSYSTEMS

      1. 1. ‘EC’ DECLARATION OF VERIFICATION OF SUBSYSTEMS

      2. 2. ‘EC’ DECLARATION OF VERIFICATION OF SUBSYSTEMS IN THE CASE OF...

        1. 2.1. . . . . . . . . . ....

        2. 2.2. . . . . . . . . . ....

      3. 3. ‘EC’ DECLARATION OF VERIFICATION OF SUBSYSTEMS IN THE CASE OF...

    6. Expand +/Collapse -

      ANNEX VI

      ‘EC’ VERIFICATION PROCEDURE FOR SUBSYSTEMS

      1. 1. GENERAL PRINCIPLES

      2. 2. CERTIFICATE OF VERIFICATION ISSUED BY A NOTIFIED BODY

        1. 2.1. Introduction

        2. 2.2. Intermediate statement of verification (ISV)

          1. 2.2.1. Principles

          2. 2.2.2. Parts of the subsystem

          3. 2.2.3. Stages of the verification procedure

        3. 2.3. Certificate of verification

          1. 2.3.1. . . . . . . . . . ....

          2. 2.3.2. . . . . . . . . . ....

          3. 2.3.3. . . . . . . . . . ....

          4. 2.3.4. . . . . . . . . . ....

        4. 2.4. Technical file accompanying the EC declaration of verification

        5. 2.5. Surveillance by notified bodies

          1. 2.5.1. . . . . . . . . . ....

          2. 2.5.2. . . . . . . . . . ....

          3. 2.5.3. . . . . . . . . . ....

          4. 2.5.4. . . . . . . . . . ....

        6. 2.6. Submission

        7. 2.7. Publication

        8. 2.8. Language

      3. 3. CERTIFICATE OF VERIFICATION ISSUED BY A DESIGNATED BODY

        1. 3.1. Introduction

        2. 3.2. Certificate of verification

        3. 3.3. Technical file

        4. 3.4. Language

      4. 4. VERIFICATION OF PARTS OF SUBSYSTEMS IN ACCORDANCE WITH ARTICLE 18(5)...

    7. Expand +/Collapse -

      ANNEX VII

      PARAMETERS TO BE CHECKED IN CONJUNCTION WITH THE PLACING IN SERVICE OF NON-TSI CONFORM VEHICLES AND THE CLASSIFICATION OF THE NATIONAL RULES

      1. 1. List of parameters

      2. 2. Classification of the rules

        1. Group A

        2. Group B

        3. Group C

    8. Expand +/Collapse -

      ANNEX VIII

      MINIMUM CRITERIA WHICH MUST BE TAKEN INTO ACCOUNT BY THE MEMBER STATES WHEN NOTIFYING BODIES

      1. 1. . . . . . . . . . ....

      2. 2. The body and the staff responsible for the checks must...

      3. 3. . . . . . . . . . ....

      4. 4. The staff responsible for the checks must possess:

      5. 5. . . . . . . . . . ....

      6. 6. . . . . . . . . . ....

      7. 7. . . . . . . . . . ....

    9. Expand +/Collapse -

      ANNEX IX

      FILE FOR SUBMITTING A DEROGATION

      1. . . . . . . . . . ....

      2. . . . . . . . . . ....

      3. . . . . . . . . . ....

    10. Expand +/Collapse -

      ANNEX X

      1. PART A Directives repealed

      2. PART B Time limits for transposition into national law

    11. Expand +/Collapse -

      ANNEX XI

      CORRELATION TABLE

      1. . . . . . . . . . ....

Back to top

Options/Help

You have chosen to open the Whole Directive

The Whole Directive you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?