xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

CHAPTER IVU.K. LEVYING OF CHARGES FOR THE USE OF RAILWAY INFRASTRUCTURE AND ALLOCATION OF RAILWAY INFRASTRUCTURE CAPACITY

SECTION 3 U.K. Allocation of infrastructure capacity

Article 54U.K.Special measures to be taken in the event of disturbance

[F11. In the event of disturbance to train movements caused by technical failure or accident, the infrastructure manager shall take all necessary steps to restore the situation to normal. To that end, it shall draw up a contingency plan listing the various bodies to be informed in the event of serious incidents or serious disturbances to train movements. In the event of a disturbance which has a potential impact on cross-border traffic, the infrastructure manager shall share any relevant information with other infrastructure managers the network and traffic of which may be affected by that disturbance. The infrastructure managers concerned shall cooperate to restore the cross-border traffic to normal.]

2.In an emergency and, where absolutely necessary, on account of a breakdown making the infrastructure temporarily unusable, the train paths allocated may be withdrawn without warning for as long as is necessary to repair the system.

The infrastructure manager may, if it deems this necessary, require railway undertakings to make available to it the resources which it feels are the most appropriate to restore the situation to normal as soon as possible.

3.Member States may require railway undertakings to be involved in assuring the enforcement and monitoring of their own compliance with the safety standards and rules.