EN ISO 3744:1995
ISO 6395:1988
The piling equipment is installed at the top of a pile which has sufficient resistance in the ground to allow the equipment to work at a steady speed. In the case of impact hammers, the cap must be supplied with a new, wooden filling. The head of the pile is 0,50 m above the test area
The period of observation shall at least be 15 seconds