Search Legislation

Council Directive of 19 March 1987 on the prevention and reduction of environmental pollution by asbestos (87/217/EEC)

 Help about what version

What Version

 Help about advanced features

Advanced Features

Close

This is a legislation item that originated from the EU

After exit day there will be three versions of this legislation to consult for different purposes. The legislation.gov.uk version is the version that applies in the UK. The EU Version currently on EUR-lex is the version that currently applies in the EU i.e you may need this if you operate a business in the EU.

The web archive version is the official version of this legislation item as it stood on exit day before being published to legislation.gov.uk and any subsequent UK changes and effects applied. The web archive also captured associated case law and other language formats from EUR-Lex.

Changes over time for: Council Directive of 19 March 1987 on the prevention and reduction of environmental pollution by asbestos (87/217/EEC) (Annexes only)

 Help about opening options

Status:

EU Directives are being published on this site to aid cross referencing from UK legislation. After IP completion day (31 December 2020 11pm) no further amendments will be applied to this version.

ANNEXU.K.METHODS OF SAMPLING AND ANALYSES

A.DISCHARGE OF AQUEOUS EFFLUENTU.K.

The reference method of analysis to determine total suspended matter (filterable matter from the non precipitated (SIC! non-precipitated) sample) as expressed in mg/l shall be filtering through a 0,45 μm filter membrane, drying at 105 °C and weighing(1).

Samples must be taken in such a way as to be representative of the discharge over a 24-hour period.

This determination must be conducted to a precision(2) of ± 5 % and an accuracy(3) of ± 10 %.

B.SPECIFICATIONS TO BE MET WHEN SELECTING A METHOD FOR MEASURING EMISSIONS INTO THE AIRU.K.

I.Gravimetric methodU.K.

1.

The method selected shall be a gravimetric method which is capable of measuring the total quantities of dust emitted through the discharge ducts.

Account shall be taken of the concentration of asbestos in dust. When concentration measurements are required, the concentration of asbestos in dust shall be measured or evaluated. The controlling authority shall decide on the periodicity of such measure, according to the characteristics of the plant and of its production, but this should be initially at least every six months. If a Member State has established that the concentration does not display any significant variation, the frequency of measurement may be reduced. Where periodical measures are not taken, the limit value specified in Article 4 of the Directive applies to the total dust emissions.

Sampling shall be conducted before any dilution of the flow to be measured.

2.

The sampling must be conducted to a precision of ± 40 % and an accuracy of ± 20 % at the limit value. The limit of detection must be 20 %. At least two measurements under the same conditions shall be made in order to check the compliance with the limit value.

3.

Operation of the installation

Measurements shall only be valid if sampling takes place while the installation is operating normally.

4.

Selecting the sampling point

Sampling shall take place at a point where there is a laminar flow of air. As far as possible, care shall be taken to avoid turbulence, and obstacles which might disrupt the flow of air.

5.

Modifications required for sampling

Suitable apertures shall be made in ducts where sampling is to take place and proper platforms shall be provided.

6.

Measurements to be taken before sampling

Before sampling commences, it is first necessary to measure air temperature and pressure and the velocity of flow in the duct. Air temperature and pressure shall normally be measured along the sampling line at normal flow rates. Under exceptional conditions, it is also necessary to measure the water vapour concentration so that the results can be amended accordingly.

7.

General requirements of the sampling procedure

The procedure requires a sample of air from a duct carrying the emissions of asbestos dust to be drawn through a filter, and the asbestos content of the dust retained in the filter to be measured.

7.1..

The sampling line shall first be checked to ensure that it is airtight and that there are no leaks which might give rise to measurement errors. The sampler head shall be carefully sealed off and the sampler pump started up. The rate of leakage shall not exceed 1 % of the normal sampling flow.

7.2..

Normally sampling shall be conducted under isokinetic conditions.

7.3..

Duration of sampling shall depend on the type of process being monitored and the sampling line used and the sampling period shall be sufficient to ensure that an adequate quantity of material is collected for weighing. It shall be representative of the full process being monitored.

7.4..

When the sampler filter is not in the immediate proximity of the sampler head, it is essential to recover materials deposited in the sampling probe.

7.5..

The sampler head and the number of points where samples must be taken shall be determined in accordance with the national standard adopted.

8.

Nature of the sampler filter

8.1..

The filter appropriate to the technique of analysis used shall be chosen. For the gravimetric method, glassfibre filters are preferable.

8.2..

A minimum filtration efficiency of 99 % is required, as defined with reference to the DOP test using an aerosol with particles of 0,3 μm diameter

9.

Weighing

9.1..

An appropriate high precision balance shall be used.

9.2..

In order to achieve the accuracy required for weighing it is essential to condition filters thoroughly before and after sampling.

10.

Expression of results

In addition to measurement data, results shall record temperature, pressure and flow data and shall include all relevant information, such as a simple diagram showing the location of sampling points, the dimensions of ducts, the volumes sampled and the method of calculation used to obtain the results. These results shall be expressed at normal temperature (273 K) and pressure (101,3 kPa).

II.Countable fibres methodU.K.

Where fibre counting procedures are used for the purpose of checking compliance with the limit value in Article 4 of the Directive, subject to the provisions of Article 6 (3) of the Directive, a conversion factor of two fibres/ml to 0,1 mg/m3 of asbestos dust may be used.

For the purposes of the Directive a fibre is defined as any object of length greater than 5 μm, breadth less than 3 μm, and having a length/breadth ratio greater than 3/1, which is countable by phase contrast optical microscopy using the European reference method defined in Annex I of Directive 83/477/EEC.

A fibre counting method shall meet the following specifications:

1.

The method shall be capable of measuring the concentration of countable fibres in the emitted gases.

The controlling authority shall decide on the periodicity of such measures, according to the characteristics of the plant and of its production, but this should be at least every six months. Where periodical measures are not taken, the limit value specified in Article 4 applies to the total dust emission.

Sampling shall be conducted before any dilution of the flow to be measured.

2.

Operation of the installation

Measurement shall only be valid if sampling takes place while the installation is operating normally.

3.

Selecting the sampling point

Sampling shall take place at a point where there is a laminar flow of air. As far as possible, care shall be taken to avoid turbulence and obstacles which might disrupt the flow of air.

4.

Modifications required for sampling

Suitable apertures shall be made in ducts where sampling is to take place, and proper platforms shall be provided.

5.

Measurements to be taken before sampling

Before sampling commences, it is first necessary to measure air temperature and pressure, and the velocity of flow in the duct. Air temperature and pressure shall normally be measured along the sampling line at normal flow rates. Under exceptional conditions, it is also necessary to measure the water vapour concentration so that the results can be amended accordingly.

6.

General requirements of the sampling procedure

The procedure requires a sample of air from a duct carrying the emissions of asbestos dust to be drawn through a filter, and the countable asbestos fibres in the dust retained on the filter to be measured.

6.1..

The sampling line shall first be checked to ensure that it is airtight, and that there are no leaks which might give rise to measurement errors. The sampling head shall be carefully sealed off and the sampling pump started up. The rate of leakage shall not exceed 1 % of the normal sampling flow.

6.2..

Sampling of the emitted gases shall be conducted inside the emission duct under isokinetic conditions.

6.3..

Duration of sampling shall depend on the type of process being monitored and the size of the sampling nozzle used. The sampling period shall be sufficient to ensure that the sample collection filter carries between 100-600 countable asbestos fibres/mm2. It shall be representative of the full process being monitored.

6.4..

The sampling head and the number of points where samples must be taken shall be determined in accordance with the national standard adopted.

7.

Nature of the sampling collection filter

7.1..

The filter appropriate to the technique of measurement shall be chosen. For the countable fibre method, membrane filters (mixed esters of cellulose or cellulose nitrate) of nominal pore size 5 μm, with printed squares and a diameter of 25 mm shall be used.

7.2..

The sample collection filter shall have a minimum filtration efficiency of 99 % with respect to countable asbestos fibres.

8.

Counting of fibres

The fibre counting method shall conform to the European reference method, as set out in Annex I of Directive 83/477/EEC.

9.

Expression of results

In addition to measurement data, results shall record temperature, pressure and flow data and shall include all relevant information, such as a simple diagram showing the location of sampling points, the dimensions of ducts, the volumes sampled and the market of calculation used to obtain the results. These results shall be expressed at normal temperature (273 K) and pressure (101,3 kPa).

(1)

See Annex III to Directive 82/833/EEC (OJ No L 378, 31. 12. 1982, p. 1).

(2)

These items are defined in Article 2 of Directive 79/869/EEC (OJ No L 271, 29. 10. 1979, p. 44) as amended by Directive 81/855/EEC (OJ No L 319, 7. 11. 1981, p. 16).

(3)

These items are defined in Article 2 of Directive 79/869/EEC (OJ No L 271, 29. 10. 1979, p. 44) as amended by Directive 81/855/EEC (OJ No L 319, 7. 11. 1981, p. 16).

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources