Commission Decision of 19 November 2008 establishing detailed guidelines for the implementation and application of Annex II to Directive 2004/8/EC of the European Parliament and of the Council (notified under document number C(2008) 7294) (Text with EEA relevance) (2008/952/EC)

 Help about what version

What Version

Close

This is a legislation item that originated from the EU

After exit day there will be three versions of this legislation to consult for different purposes. The legislation.gov.uk version is the version that applies in the UK. The EU Version currently on EUR-lex is the version that currently applies in the EU i.e you may need this if you operate a business in the EU.

The web archive version is the official version of this legislation item as it stood on exit day before being published to legislation.gov.uk and any subsequent UK changes and effects applied. The web archive also captured associated case law and other language formats from EUR-Lex.

Status:

This is the original version (as it was originally adopted).

  1. Introductory Text

  2. Article 1.The detailed guidelines clarifying the procedures and definitions necessary for...

  3. Article 2.This Decision is addressed to the Member States.

  4. Signature

    1. ANNEX

      Detailed guidelines for the implementation and application of Annex II to Directive 2004/8/EC

      1. I. Calculation of the electricity from cogeneration

        1. 1. A cogeneration unit operating with maximum technically possible heat recovery...

        2. 2. For cases in which the plant does not operate in...

          1. Figure 1 CHP part, non-CHP part and heat-only boilers within a plant...

        3. 3. For micro-cogeneration units, the certified values have to be issued,...

        4. 4. The electricity from cogeneration is calculated in accordance with the...

        5. 5. Step 1

          1. 5.1. To distinguish which part of the electricity produced is not...

          2. 5.2. The overall efficiency of a cogeneration unit is determined in...

          3. 5.3. The calculation of overall efficiency has to be based on...

          4. 5.4. The reporting period means the period of operation of the...

          5. 5.5. The energy output means the total electrical energy (CHP and...

          6. 5.6. In accordance with the definitions in Article 3(b) and 3(c)...

          7. 5.7. Examples of heat other than useful heat are the following:...

          8. 5.8. Exported heat used in power generation on another site does...

          9. 5.9. Non-CHP electricity means the electrical energy generated by a cogeneration...

          10. 5.10. Non-CHP electricity generation might occur in the following cases:

          11. 5.11. The fuel input means the total (CHP and non-CHP) fuel...

          12. 5.12. CHP fuel energy means the fuel energy based on lower...

          13. 5.13. Non-CHP fuel energy means the fuel energy, based on lower...

        6. 6. Step 2

          1. 6.1. All the measured electrical energy output and all the measured...

          2. 6.2. For micro-cogeneration units (up to 50 kWe) with actual operation...

        7. 7. Step 3

          1. 7.1. If the overall efficiency of the cogeneration unit is lower...

          2. 7.2. For the CHP part, the plant operator shall check the...

          3. 7.3. This actual ‘power to heat ratio’ will allow the operator...

          4. 7.4. For cogeneration units under development or in the first year...

        8. 8. Step 4

          1. 8.1. If the actual ‘power to heat ratio’ of the cogeneration...

          2. 8.2. In that case however, the operator has to notify to...

        9. 9. Step 5

          1. 9.1. The calculated electricity in Step 3 and Step 4 will...

          2. 9.2. To calculate the primary energy savings, it is necessary to...

      2. II. Cogeneration system boundaries

        1. 1. The boundaries of a cogeneration system shall be laid around...

        2. 2. A cogeneration unit supplies energy products to a consumer area....

          1. Figure 2 Area of cogeneration unit

        3. 3. The CHP electricity output shall be measured at the generator...

        4. 4. Other heat or electricity production equipment such as heat-only-boilers and...

          1. Figure 3 Selection of the correct system boundaries in case of auxiliary/stand...

        5. 5. The secondary steam turbines (see Figure 4) must be included...

          1. Figure 4 Selection of the correct system boundaries in the case of...

        6. 6. Where prime movers (i.e. engine or turbine) are connected in...

          1. Figure 5 Boundary of cogeneration unit for connected prime movers

        7. 7. When the first prime mover is not producing electricity or...

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources