F1ANNEXTechnical Specification for Interoperability relating to the subsystem Rolling Stock — Freight Wagons
Annotations:
Amendments (Textual)
F1ANNEX AAASSESSMENT PROCEDURES
Verification of Subsystems
Verification of Subsystems
F1MODULES FOR THE EC VERIFICATION OF SUBSYSTEMSModule SF: Product Verification
F11.This module describes the EC verification procedure whereby a notified body checks and certifies at the request of an contracting entity or its authorised representative established within the Community, that a Rolling Stock Freight wagon subsystem, for which a type-examination certificate has already been issued by a notified body,
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Repealed by Commission Regulation (EU) No 321/2013 of 13 March 2013 concerning the technical specification for interoperability relating to the subsystem ‘rolling stock — freight wagons’ of the rail system in the European Union and repealing Decision 2006/861/EC (Text with EEA relevance).