The Railtrack (Shortlands Junction) Order 2001

Power to construct and maintain scheduled works

4.—(1) Railtrack may construct and maintain the scheduled works.

(2) Subject to article 6 below, the scheduled works shall be constructed in the lines or situations shown on the deposited plans and in accordance with the levels shown on the deposited sections.