SCHEDULE 1Scheduled works

(introduced by section 2)

In the local government areas of North Lanarkshire, West Lothian and the City of Edinburgh a railway between Drumgelloch and Bathgate, substantially on the solum of the former railway, together with linked improvements to sections of the existing operational railway between Airdrie and Drumgelloch and Bathgate and Edinburgh, associated railway sidings and other works, including the raising of bridges along the existing railway between Bathgate and Edinburgh, and provision for new stations at Caldercruix and Armadale and relocated stations at Bathgate and Drumgelloch; including roads and private accesses necessitated by the railway works, and comprising—

In the local government areas of North Lanarkshire and West Lothian—

Work No. 1—A railway (22,032 metres in length) commencing by a junction with the Drumgelloch-Helensburgh via Queen Street Low Level and Singer Railway at a point 141 metres west of the bridge carrying Crowwood Drive over that railway, passing eastwards largely along the solum of the former railway, and terminating by a junction with the Bathgate branch railway at the relocated Bathgate station at a point 103 metres south of the junction of Gordon Avenue with Edinburgh Road. Work No. 1 includes new stations at Caldercruix and Armadale and relocated stations at Drumgelloch and Bathgate.

In the local government area of West Lothian—

  • Work No. 1A—A railway (668 metres in length) commencing by a junction with the Bathgate branch railway at a point 240 metres south of the junction of Gordon Avenue with Edinburgh Road, passing eastwards and terminating at a point 82 metres west of the bridge carrying Blackburn Road (B 782) over the Bathgate branch railway. Work No. 1A includes the removal of Rennie's overbridge carrying a path between Edinburgh Road and the Bathgate Golf Course.

  • Work No. 1AA—A railway (554 metres in length and forming sidings for a light maintenance depot at the site of the relocated Bathgate station) commencing at a point 155 metres south of the junction of Gordon Avenue with Edinburgh Road, passing eastwards and terminating by a junction with Work No. 1A at a point 450 metres east of Rennie's overbridge carrying a path between Edinburgh Road and the Bathgate Golf Course.

In the local government area of North Lanarkshire—

  • Work No. 1B—A footbridge over the Drumgelloch-Helensburgh via Queen Street Low Level and Singer Railway at Airdrie Station.

  • Work No. 1C—A footbridge over the railway (Work No. 1), at the relocated Drumgelloch station.

  • Work No. 1D—A footbridge over the railway (Work No. 1) at the new station at Caldercruix.

In the local government area of West Lothian—

  • Work No. 1E—A footbridge over the railway (Work No.1) at the new station at Armadale.

  • Work No. 1F—A footbridge over the Bathgate branch railway at the relocated Bathgate station.

  • Work No. 1G—A railway (480 metres in length and forming sidings for a freight depot at Boghall) commencing by a junction with the Bathgate branch railway at a point 28 metres east of the bridge carrying the A7066 over that railway, passing eastwards, and terminating at Boghall at a point 69 metres west of the bridge carrying Starlaw Road over the M8.

In the local government area of North Lanarkshire—

  • Work No. 2A—A cyclepath at Clarkston, commencing in Calderigg Place at a point 7 metres east of the junction of Torrance Avenue with Calderigg Place, passing north-eastwards and eastwards and terminating in Dunrobin Road at a point adjacent to the southern side of the entrance to Caldervale Forge.

  • Work No. 2B—A cyclepath commencing in Towers Road (Work No. 7) Clarkston at a point 7 metres north of the junction of Katherine Street with Towers Road, passing eastwards and northwards, then in a generally eastwards direction crossing over Katherine Park Lane at Clarkston, then passing northwards and eastwards and southwards, then in a generally eastwards direction then northwards and eastwards at Plains and terminating by a junction with the road (Work No. 9) at a point 151 metres south-east of the junction of that unnamed road with Main Street (A89).

  • Work No. 2C—A cyclepath adjacent to Brownieside Road, Plains, commencing in that road at a point 50 metres south-east of Brownieside Mill House, passing north-westwards and terminating by a junction with the road (Work No. 10) at a point 18 metres south-east of Brownieside Cottage.

  • Work No. 2E—A cyclepath commencing by a junction with Main Street (A89), passing northwards and south eastwards, then in a generally eastwards direction, southwards then eastwards and terminating at a point 6 metres south of overbridge 240/052, Caldercruix.

In the local government areas of North Lanarkshire and West Lothian—

Work No. 2F—A cyclepath commencing in Main Street, Caldercruix, at a point 44 metres east of the junction of Glengowan Road with Main Street, passing in a generally easterly direction over North Calder Water, then alongside Hillend Reservoir, and through Bracco Wood, then continuing in a generally easterly direction and terminating by a junction with the existing cyclepath at Mosshouse at a point 80 metres south of the southern corner of the main building at Mosshouse. Work No.2F includes the raising of the bridge over the railway (Work No.1) at Crawberry Hill.

In the local government area of West Lothian—

Work No. 2G—A cyclepath south of the disused Redburn Quarry, commencing by a junction with the existing cyclepath at a point 406 metres south of the junction of an existing track with Main Street (A89), passing southwards, then eastwards and northwards, and terminating by a junction with the existing cyclepath at a point 413 metres south of the junction of that existing track with Main Street.

In the local government areas of North Lanarkshire and West Lothian—

Work No. 2J—A cyclepath commencing by a junction with the existing cyclepath at a point 170 metres south-east of the junction of Bedlormie Drive with Redburn Road, passing eastwards over Barbauchlaw Burn, then southwards and eastwards across the track leading to the western entrance to Standhill Farm, continuing eastwards and terminating by a junction with the Millbank Quarry Road (Work No. 30B) at a point 175 metres south of the junction with the track leading to the eastern entrance to Standhill Farm with Millbank Quarry Road.

In the local government area of West Lothian—

  • Work No. 2K—A cyclepath at Blackridge, commencing by a junction with Harthill Road (B718) at a point 9 metres east of the junction of Station Road with Harthill Road, passing eastwards and terminating by a junction with the existing cyclepath at a point 174 metres east of that road junction.

  • Work No. 2L—A cyclepath commencing by a junction with the existing cyclepath at Westrigg at a point 180 metres west of the southern end of the track leading to Brownclair and Airdrie Road (A 89) passing eastwards and terminating at Armadale by a junction with Stonerigg Road at a point 194 metres south-east of that Burn.

  • Work No. 2N—A cyclepath commencing at Armadale by a junction with Stonerigg Road at a point 224 metres east of Black Moss Burn, passing eastwards to Armadale, then northwards, and terminating by a junction with Station Road (B8084) at a point 190 metres south of the junction of Morgan Way with Station Road.

  • Work No. 2P—A cyclepath commencing at Armadale by a junction with the road (Work No. 34) at a point 288 metres south-east of the junction of Morgan Way with Station Road, passing in a generally easterly direction and terminating at Teepit Hill by a junction with the cyclepath (Work No. 2Q) at a point 208 metres west of the junction of Birniehill Avenue with Birniehill Crescent.

  • Work No. 2Q—A cyclepath at Teepit Hill, commencing by a junction with the cyclepath (Work No. 2P) at its termination, passing westwards, then southwards and eastwards, and terminating by a junction with the cyclepath (Work No. 2R) at a point 88 metres west of the junction of Birniehill Avenue with Birniehill Crescent.

  • Work No. 2R—A cyclepath commencing by a junction with the cyclepath (Work No.2Q) at its termination, passing eastwards and terminating by a junction with Birniehill Avenue at its junction with Birniehill Crescent.

  • Work No. 2S—A cyclepath at Bathgate, commencing by a junction with Birniehill Avenue at a point 104 metres north-east of the junction of Birniehill Road with Birniehill Avenue, passing north-eastwards, then northwards and terminating at a point on the eastern side of Whitburn Road 25 metres east of the junction of the access road leading to the Bathgate Health Centre with Whitburn Road.

In the local government area of North Lanarkshire—

  • Work No. 4—A road, being a raising of Carlisle Road (A 73), Airdrie, over the Drumgelloch-Helensburgh via Queen Street Low Level and Singer Railway commencing in that road at a point 53 metres south of the centre of the roundabout at the junction of that road with Clark Street, Motherwell Street and Forrest Street, and terminating in Carlisle Road at a point 150 metres south of the centre of that roundabout.

  • Work No. 5—A road forming a means of access from Calderrigg Road to the relocated Drumgelloch station.

  • Work No. 6—A road forming a means of access from Forrest Street to the new station car park at Drumgelloch.

  • Work No. 7—A road, being a raising of Towers Road, Clarkston, over the railway (Work No. 1) commencing in that road at a point 53 metres north-west of the junction of Dunrobin Road with Towers Road and terminating in Towers Road at a point 10 metres north of the junction of Katherine Street with Towers Road.

  • Work No. 8A—A temporary road at Clarkston, for the duration of the construction of Work No. 8B, commencing at a point in Katherine Park Lane 30 metres south of the south-eastern corner of Wester Moffat farm house, passing northwards and terminating in Katherine Park Lane at a point 137 metres south-east of the junction of that road with Forrest Street.

  • Work No. 8B—A road, being a raising of Katherine Park Lane, Clarkston, over the railway (Work No. 1), commencing in that road at a point 29 metres south of the south-eastern corner of Wester Moffat farm house, passing northwards over the railway (Work No. 1) and terminating in that road at a point 142 metres south-east of the junction of that road with Forrest Street. Work No. 8B includes a bridge over the railway (Work No. 1).

  • Work No. 9—A road at Plains commencing by a junction with Main Street (A 89) at a point 35 metres east of the junction of Meadowhead Road with Main Street (A 89) passing south-eastwards over the railway (Work No.1) then eastwards and terminating by a junction with Brownieside Road in that road at a point 47 metres south-east of the south-eastern corner of Brownieside Mill House. Work No. 9 includes a bridge over the railway (Work No.1).

  • Work No. 9A—A road at Plains commencing by a junction with the road (Work No. 9) passing eastwards and terminating at the entrance to the existing Express Dairies depot.

  • Work No. 10—A road at Plains commencing by a junction with Brownieside Road at a point in that road 21 metres south-east of the south-eastern corner of Brownieside Cottage, passing north-eastwards and terminating at the entrance to Ford Farm, Loadmanford.

  • Work No. 11—A road at Plains commencing by a junction with the road (Work No.12) at a point in Station Road 69 metres south-east of the junction of that road with Main Street (A89), passing north-eastwards and terminating at a point 65 metres north-east of the junction of Station Road with Main Street (A89).

  • Work No. 12—A realignment of Station Road, Plains, commencing in that road at a point 65 metres south-east of its junction with Main Street (A89), passing north-westwards and terminating in Station Road at a point 41 metres south-east of its junction with Main Street.

  • Work No. 13—A footbridge over the railway (Work No. 1) at Plains to provide a link between Main Street (A89), Brownieside Road and Plains Country Park commencing by a junction with Main Street (A89), passing south-eastwards then south-westwards and terminating by a junction with Station Road.

  • Work No. 14—A temporary realignment of Main Street (A 89)/Airdrie Road (A 89) east of Plains, commencing in Main Street at a point 315 metres north-east of Ford Bridge, passing westwards, then south-westwards and terminating in Airdrie Road (A89) at a point 94 metres north-east of Ford Bridge. Work No. 14 includes a bridge over the railway (Work No. 1).

  • Work No. 15—A temporary realignment of the Caldercruix Sewage Works and Easterton Farm access road commencing in that access road at a point 98 metres north of its junction with Airdrie Road (A89), passing generally northwards and terminating in that access road at a point 172 metres north of that road junction.

  • Work No. 16—A realignment of Airdrie Road (A 89), Caldercruix commencing in that road at a point 198 metres east of the entrance to Clints Farm, passing westwards and terminating in that road at a point 19 metres east of that farm entrance.

  • Work No. 16A—An access road at Caldercruix commencing by a junction with the realigned Airdrie Road (Work No. 16) at a point 119 metres east of the entrance to Clints Farm, passing northwards over North Calder Water, and terminating at Caldercruix at a point 192 metres north-east of that farm entrance. Work No. 16A includes a bridge over North Calder Water.

  • Work No. 18—An improvement of Main Street, Caldercruix, commencing at a point in that road at its junction with Airdrie Road (A 89), passing northwards over North Calder Water and terminating in Main Street at a point 30 metres west of the junction of Church Place with Main Street. Work No. 18 includes a bridge over North Calder Water.

  • Work No. 19—A road, being a raising of Main Street, Caldercruix, over the railway (Work No. 1), commencing in Main Street at a point 38 metres north-east of the junction of Millstream Crescent with Main Street, passing in a north-easterly direction over the railway (Work No. 1) and terminating in Main Street at a point 10 metres north-east of the junction of Station Road with Main Street. Work No. 19 includes a bridge over the railway (Work No. 1).

  • Work No. 20A—A temporary road at Hillend, for the duration of the construction of Work No. 20B, commencing in the unnamed road between Airdrie Road (A 89) and Hillend Reservoir Car Park at a point 122 metres north of the junction of that road with Airdrie Road, passing northwards and terminating in that unnamed road at a point 269 metres north of that road junction.

  • Work No. 20B—A road, being a raising of the unnamed road between Airdrie Road (A 89) and Hillend Reservoir Car Park, over the railway (Work No. 1), commencing in that unnamed road at a point 122 metres north of its junction with Airdrie Road, passing northwards over the railway (Work No. 1), and terminating in that unnamed road at a point 269 metres north of that road junction. Work No. 20B includes a bridge over the railway (Work No. 1).

  • Work No. 21—A footbridge over the railway (Work No. 1) at Hillend Fishing Lodge between Airdrie Road (A89) and Hillend Angling Club.

  • Work No. 22A—A temporary road at Forrestfield, for the duration of the construction of Work No. 22B, commencing by a junction with Airdrie Road at a point 25 metres west of the existing junction of Woodside Road with Airdrie Road (A 89), passing northwards and terminating by a junction with Work No. 23.

  • Work No. 22B—A road, being a raising of Woodside Road, Forrestfield, over the cyclepath (Work No. 2F) and the railway (Work No. 1), commencing at the junction of Airdrie Road (A 89) with Woodside Road, passing northwards over the cyclepath (Work No. 2F) and the railway (Work No. 1), and terminating by a point in Woodside Road 165 metres north of that junction. Work No. 22B includes a bridge over the cyclepath (Work No. 2F) and the railway (Work No. 1).

  • Work No. 23—An access road at Forrestfield, commencing by a junction with Woodside Road at a point 165 metres north of the junction of that road with Airdrie Road (A89), passing southwards then westwards and terminating at a point 140 metres south-west of its commencement.

  • Work No. 24—A road at Raiziehill, commencing at a point adjacent to the property known as Raiziehill, passing northwards, then eastwards and terminating by a junction with the track between the unnamed road and the property known as Raiziehill at a point 82 metres north of that property.

In the local government areas of North Lanarkshire and West Lothian—

  • Work No. 25A—A temporary road at Bedlormie Toll, for the duration of the construction of Work No. 25B, commencing in Airdrie Road (A89) at a point 173 metres south-east of the property known as Raiziehill, passing eastwards and terminating at a point in Airdrie Road 521 metres south-east of that property.

  • Work No. 25B—A road, being a raising of Airdrie Road (A 89), Bedlormie Toll, over the railway (Work No. 1) and the cyclepath (Work No. 2F), commencing in that road at a point 200 metres south-east of the property known as Raiziehill, passing eastwards over the railway (Work No. 1) and the cyclepath (Work No. 2F), and terminating in Airdrie Road (A89) at a point 390 metres east of that property. Work No. 25B includes a bridge over the railway (Work No. 1) and the cyclepath (Work No. 2F).

In the local government area of West Lothian—

  • Work No. 26—A road at Mosshouse, commencing at a point adjacent to the property known as Mosshouse 36 metres south-west of the main building at Mosshouse, passing southwards over the railway (Work No. 1) then westwards and terminating at a point 133 metres south-west of the southern corner of that main building. Work No. 26 includes a bridge replacing the existing bridge over the railway (Work No. 1).

  • Work No. 27—A road in part adjacent to the disused Redburn Quarry, being a realignment of the Bogend Farm Access Road between Main Street (A 89) and Bogend Farm, commencing in that access road at a point 200 metres south of that unamed road with Main Street, passing southwards over the railway (Work No. 1) and terminating at a point in Bogend Farm 496 metres south of that road junction. Work No. 27 includes a bridge over the railway (Work No. 1).

  • Work No. 28—An access road adjacent to the disused Redburn Quarry, commencing by a junction with the road (Work No. 27) passing southwards and terminating at a point 79 south-westwards of that junction.

In the local government areas of North Lanarkshire and West Lothian—

Work No. 29—A road west of Blackridge, being a realignment of the unnamed road leading to the western entrance to Standhill Farm, commencing in that unnamed road at a point 30 metres south of that entrance, passing southwards over the railway (Work No. 1) and terminating in that unnamed road at a point 173 metres south of that entrance. Work No. 28 includes a bridge over the railway (Work No. 1).

In the local government area of West Lothian—

  • Work No. 30A—A temporary road at Blackridge, for the duration of the construction of Work No. 30B, commencing in Millbank Quarry Road at a point 96 metres south of the junction of the access road leading to the eastern entrance to Standhill Farm with Millbank Quarry Road, passing south-eastwards and terminating in Station Road at a point 240 metres south-east of that road junction.

  • Work No. 30B—A road, being a raising of Millbank Quarry Road/Station Road, Blackridge, over the railway (Work No. 1), commencing in Millbank Quarry Road at a point 113 metres south of the junction of Millbank Quarry Road with the access road leading to the eastern entrance to Standhill Farm, passing south-eastwards over the railway (Work No. 1), and terminating in Station Road at a point 216 metres south of that road junction. Work No. 30B includes a bridge over the railway (Work No. 1).

  • Work No. 31—A road, being a lowering of Harthill Road (B718), Blackridge, under the railway (Work No. 1), commencing in Westcraigs Road at a point 36 metres south of the bridge carrying that road over Barbauchlaw Burn, passing southwards under the railway (Work No. 1), and terminating in Harthill Road (B718) at a point 5 metres east of the junction of Station Road with Harthill Road. Work No. 31 includes a bridge replacing the existing bridge under the railway (Work No. 1).

  • Work No. 31A—A road at Blackridge, commencing at a point 482 metres south-east of the junction of Airdrie Road (A89) with the access track adjacent to Brownclair, passing south-westwards, then northwards over the railway (Work No. 1) and the cyclepath (Work No. 2L) and terminating at a point 258 metres south of that junction. Work No. 31A includes a bridge over the cyclepath (Work No. 2L) and the railway (Work No. 1).

In the local government areas of North Lanarkshire and West Lothian—

Work No. 32—A road at Black Moss Burn, commencing by a junction with Stonerigg Road at a point 197 metres south-east of Black Moss Burn, passing south-eastwards and terminating by a junction with the access road between Netherhouses and Westfield Farm and Stonerigg Road at a point 317 metres south of the junction of that access road and Stonerigg Road.

In the local government area of West Lothian—

  • Work No. 33—A realignment of Station Road (B8084), Armadale, commencing in Station Road at a point 101 metres south of No.79 Station Road, passing north-westwards over the railway (Work No. 1) then northwards and terminating in that road at a point 38 metres south of the junction of Morgan Way with Station Road. Work No. 33 includes a bridge over the railway (Work No. 1).

  • Work No. 34—A road at Armadale, commencing by a junction with the road (Work No. 33) at a point 114 metres south of the junction of Morgan Way with Station Road (B 8084), passing north-eastwards then eastwards and south-eastwards across the road (Work No. 37) and terminating in the new station car park at Armadale at a point 302 metres south-east of the junction of Morgan Way with Station Road.

  • Work No. 35—An access road at Armadale, commencing by a junction with the road (Work No. 33) at a point 25 metres south-west of No. 79 Station Road, passing westwards and terminating by a junction with Springfield Access Road at a point 82 metres west of No. 79 Station Road.

  • Work No. 36—A road at Armadale, commencing in the access road leading to Tarrareoch Farm and Honeysuckle cottage at a point 223 metres east of that road junction, passing south-westwards and terminating by a junction with the road (Work No. 34) at a point 189 metres east of the junction of Morgan Way with Station Road (B8084).

  • Work No. 37—A road at Armadale, commencing at a point 218 metres east of the junction of Morgan Way with Station Road (B 8084), passing north-eastwards across the road (Work No. 34) and terminating at a point 284 metres east of that road junction.

  • Work No. 38—A road at Whiteside, commencing at the proposed feeder station adjacent to the A 801 road overbridge 240/034A, passing eastwards and terminating by a junction with the track leading to Whitburn Road (B7002) at a point 374 metres north-west of the junction of that track with that road.

  • Work No. 39A—A temporary road at Bathgate, for the duration of the construction of Work No. 39B, commencing in Whitburn Road (B7002) at a point 132 metres east of the junction of Birniehill Road with Birniehill Avenue, passing northwards and terminating in Whitburn Road (B7002) at a point 4 metres north-west of the junction of Whiteside with Whitburn Road (B7002).

  • Work No. 39B—A road, being a raising of Whitburn Road, Bathgate (B7002), over the cyclepath (Work No. 2S) and the railway (Work No. 1), commencing in Whitburn Road (B7002) at a point 138 metres east of the junction of Birniehill Road with Birniehill Avenue, passing northwards over the cyclepath (Work No. 2S) and the railway (Work No. 1), and terminating at a point in Whitburn Road 9 metres north-west of the junction of Whiteside with Whitburn Road. Work No. 39B includes a bridge over the cyclepath (Work No. 2S) and the railway (Work No. 1).

  • Work No. 40—A road at Bathgate, commencing in Menzies Road at a point 34 metres north-west of the centre of the existing roundabout at the junction of Menzies Road with Whitburn Road (B7002), passing south-eastwards, then eastwards and south-eastwards and terminating at a point 148 metres south of the junction of Academy Street with Edinburgh Road.

  • Work No. 41—A road at Bathgate, commencing in Whitburn Road (B7002) at a point 54 metres east of the centre of the existing roundabout at the junction of Menzies Road with Whitburn Road, passing south-westwards and terminating in Whitburn Road at a point 54 metres south-west of the centre of that existing roundabout.

  • Work No. 42—A road at Bathgate, commencing at the entrance to Bathgate Foundry, passing south-westwards and terminating by a junction with the road (Work No. 40) at a point 48 metres south-east of the centre of the existing roundabout at the junction of Menzies Road with Whitburn Road.

  • Work No. 43—An access road at Bathgate, commencing by a junction with the road (Work No. 40) at a point 121 metres south of the junction of Academy Street with Edinburgh Road, passing south-eastwards and terminating in the access road leading to Bathgate Golf Course at a point 175 metres south-east of that road junction.

  • Work No. 44—A footbridge over the Bathgate branch railway at Boghall, to carry the existing path between Hunter Grove and the A7066.

  • Work No. 45—A temporary road at Boghall, commencing by a junction with the A 7066 at a point 35 metres north-west of the centre of the roundabout at that junction, passing northwards then north-eastwards and northwards and terminating at a point 51 metres south-west of the footbridge (Work No. 44).

  • Work No. 46—A road at Boghall, commencing by a junction with the A7066 at a point 30 metres south-east of the centre of the roundabout at the junction of that road with the entrance to The Pyramids Business Park, passing north-eastwards then eastwards and northwards and terminating in Bog Burn at a point 155 metres south-east of the bridge carrying the A7066 over the Bathgate branch railway.

  • Work No. 47A—A temporary road at Livingston, for the duration of the construction of Work No. 47B, commencing in Deans North Road at a point 10 metres south-east of its junction with Deans South Road, passing south-eastwards and terminating in Deans North Road at a point 118 metres south-east of that road junction.

  • Work No. 47B—A road, being a raising of Deans North Road, Livingston, over the Bathgate branch railway, commencing in that road at a point 19 metres south-east of its junction with Deans South Road, passing south-eastwards and terminating in Deans North Road at a point 109 metres south-east of its junction with Deans South Road. Work No. 47B includes a bridge over the Bathgate branch railway.

  • Work No. 48A—A temporary footbridge over the Bathgate branch railway at Camps Rigg, Livingston, for the duration of the construction of Work No. 48B, to carry the path between Camps Rigg and Sutherland Way.

  • Work No. 48B—A raising of the footbridge over the Bathgate branch railway at Camps Rigg, Livingston which carries the path between Camps Rigg and Sutherland Way.

  • Work No. 49A—A temporary footbridge over the Bathgate branch railway at Morrison Way, Livingston, for the duration of the construction of Work No. 49B, to carry the path known as The Loan Path.

  • Work No. 49B—A raising of the footbridge over the Bathgate branch railway at Morrison Way, Livingston, which carries the path known as The Loan Path.

  • Work No. 50—A raising of the footbridge over the Bathgate branch railway at the Houstoun Industrial Estate, Livingston East, which carries a path into that estate.

  • Work No. 51—A road at Uphall commencing by a junction with Station Road at a point 204 metres north of the bridge carrying the M8 over that road, passing eastwards then southwards and terminating in plot no. 989 at a point 204 metres north-east of that bridge.

  • Work No. 52—A footbridge over the Bathgate branch railway and the M8 at Uphall Station providing a link between the proposed northern car park and the southern platform of the station.

  • Work No. 52A—A ramp from the central span of the footbridge (Work No. 52) to the northern platform of Uphall Station.

In the local government area of the City of Edinburgh—

  • Work No. 53—An access road in the Newbridge Industrial Estate commencing by a junction with Cliftonhall Road at a point 21 metres south of the bridge carrying the Edinburgh to Glasgow Main Line over that road, passing eastwards then southwards and terminating at a point adjacent to the Bathgate branch railway 316 metres east of that bridge.

  • Work No. 54A—A temporary road at Norton Mains, for the duration of the construction of Work No. 54B, commencing on the southern side of the Edinburgh to Glasgow Main Line in the track leading to Norton Mains Cottages at a point 138 metres south-west of those Cottages, passing northwards and terminating on the northern side of the Edinburgh to Glasgow Main Line in the track leading to Norton Mains Cottages at a point 53 metres west of those Cottages.

  • Work No. 54B—A road, being a raising of the track leading Norton Mains Cottages, Norton Mains, over the Edinburgh to Glasgow Main Line, commencing on the southern side of that railway in the track leading to those Cottages at a point 120 metres south-west of those Cottages, passing northwards over that railway and terminating on the northern side of that railway in the track leading to those Cottages at a point 85 metres west of those Cottages. Work No. 54B includes a bridge over the Edinburgh to Glasgow Main Line.

  • Work No. 55A—A temporary road at Roddinglaw, for the duration of the construction of Work No. 55B, commencing in Roddinglaw Road at a point 146 metres north-west of No.1 Roddinglaw Cottages, passing southwards and terminating in that road at a point 19 metres north-west of that Cottage.

  • Work No. 55B—A road, being a raising of Roddinglaw Road, Roddinglaw, over the Edinburgh to Glasgow Main Line, commencing in that road at a point 129 metres north-west of No.1 Roddinglaw Cottages, passing southwards over that railway and terminating in that road at a point 29 metres-west of that Cottage. Work No. 55B includes a bridge over the Edinburgh to Glasgow Main Line.

  • Work No. 56A—A temporary road at Gogar, for the duration of the construction of Work No. 56B, commencing in Gogar Station Road at a point adjacent to No.3 Poultry Farm Cottages, passing southwards and terminating in that road at a point 100 metres north-west of Gogar Bank House.

  • Work No. 56B—A road, being a raising of Gogar Station Road, Gogar, over the Edinburgh to Glasgow Main Line, commencing in that road at a point 60 metres south of No.3 Poultry Farm Cottages, passing southwards over that railway and terminating in that road at a point 124 metres north-west of Gogar Bank House. Work No. 56B includes a bridge over the Edinburgh to Glasgow Main Line.

  • Work No. 57A—A temporary road at Gogar, for the duration of the construction of Work No. 57B, commencing on the northern side of the Edinburgh to Glasgow Main Line in the track leading to Fairview at a point 105 metres north-west of the bridge carrying The City of Edinburgh Bypass (A 720) over that railway, passing southwards and terminating on the southern side of the Edinburgh to Glasgow Main Line in that track at a point 77 metres north-west of the bridge carrying The City of Edinburgh Bypass (A 720) over that railway.

  • Work No. 57B—A road, being a raising of the track leading to Fairview, Gogar, over the Edinburgh to Glasgow Main Line, commencing on the northern side of that railway in that track at a point 67 metres north-west of the bridge carrying The City of Edinburgh Bypass (A720) over that railway, passing southwards and terminating on the southern side of the Edinburgh to Glasgow Main Line in that track at a point 64 metres north-west of the bridge carrying The City of Edinburgh Bypass (A 720) over that railway. Work No. 57B includes a bridge over the Edinburgh to Glasgow Main Line.

SCHEDULE 2Ancillary works

(introduced by section 3)

1

Stations, buildings, platforms, junctions and stopping places.

2

Bridges, subways, stairs, lifts, escalators, roundabouts and means of access.

3

Junctions and communications with, and widening of, any road, path or way.

4

Works for the provision (for the authorised undertaker or any other person) of apparatus, plant or machinery and for the accommodation of such works, including telecommunications and radio masts, communications equipment, mains, sewers, pipes, drains, cables, lights, conduits and culverts.

5

Works for the strengthening, underpinning, protection, alteration or demolition of any building or structure.

6

Works or operations to stabilise the condition of any land or for the purposes of flood prevention.

7

Works to alter the course of, or otherwise interfere with, non-navigable rivers, streams or watercourses.

8

Works to alter the position of any existing apparatus or any existing street furniture, including the alteration of the position of existing works of the sort described in paragraph 4 above.

9

Without prejudice to the generality of paragraph 8 above, works to alter the position of any railway track or other railway apparatus.

10

Landscaping, ecological and other works to mitigate any adverse effects of the construction, maintenance or operation of the authorised works.

11

Works for the benefit or protection of premises affected by the authorised works.

12

The removal by the authorised undertaker of any works constructed by it pursuant to this Act which have been constructed as temporary works or which it no longer requires.

13

Such other works (of whatever nature) as may be necessary or expedient for the purposes of, in connection with, or in consequence of, the construction of the authorised works.

SCHEDULE 3Stopping up and diversion of roads

(introduced by sections 10 and 15)

Part 1Roads to be permanently stopped up

Sheet of Parliamentary plans

Road to be stopped up

Extent of stopping up

Substitute to be provided or alternative

(1)

(2)

(3)

(4)

4

Cyclepath between the buffer stops at Drumgelloch station and road (unnamed) off Calderigg Place, Drumgelloch

Between points P1 and P2

Crowwood Drive, Bankhead Avenue and Calderigg Place

4

Cyclepath between road (unnamed) off Calderigg Place and old Airdrie Bathgate Railway solum, Drumgelloch

Between points P2 and P3

Crowwood Drive and Drumclair Place

4

Cyclepath on old Airdrie Bathgate Railway solum, Drumgelloch

Between points P1 and P4

Crowwood Drive, Clarkston Drive and Drumclair Place

4

Footpath between Caldervale Forge and Springfield, Clarkston

Between points P4A and P4B

Work No. 1C

4

Footpath between Station Road and access to Dunrobin Road

Between points P4C and P4D

Works Nos. 1C and 7

4

Cyclepath on old Airdrie Bathgate Railway solum, Drumgelloch

Between points P4 and P5

Crowwood Drive, Clarkston Drive, Forrest Street and Towers Road

4

Footpath between Station Road and Dunrobin Road, west of Towers Road overbridge

Between points P5 and P5A

Work No. 7

4

Footpath between Towers Road and Katherine Park

Between points P6 and P6A

Work No. 7

4

Cyclepath at Towers Road, Clarkston

Between points P5 and P6

Work No. 7

4, 5

Cyclepath between Towers Road and Katherine Park access road/Wester Moffat Farm access track, Clarkston

Between points P6 and P7

Towers Road, Forrest Street and Katherine Park Lane

5

Footpath between existing Cyclepath and Katherine Park

Between points P7A and P7B

Works Nos. 2B and 8B

5

Access between Forrest Street (A89) and Wester Moffat Farm field

Between points P7C and P7D

Works Nos. 2B and 8B

5

North Calder Heritage Trail, Plains

Between points P7B and P7E

Towers Road and Work No. 2B

5

Cyclepath across old Airdrie Bathgate Railway solum, between Clarkston and Plains

Between points P7 and P8

Works Nos. 2B and 8B

5,6

Access between St. Philips School and Wester Moffat Farm field

Between points P8A and P8B

Works Nos. 2B and 8B

5, 6, 7

Cyclepath between access track to St. Philips School and Station Road, Plains

Between points P8 and P11

Airdrie Road, Main Street and Station Road

6

Access between Main Street and Express Dairies Depot, Plains

Between points P9 and P10

Works Nos. 9 and 9A

6

Access between Cyclepath and St. Philips School

Between points P9A and P9B

Works Nos. 2B and 9

7

Station Road, Plains

Between points P12 and P13

Station Road, Main Street and Work No. 13

7

Footpath between Station Road and Plains Country Park, Plains

Between points P13 and P16

Works Nos. 2C, 9 and 10

7

Footpath between old Airdrie Bathgate Railway solum and Plains Country Park, Plains

Between points P14 and P17

Works Nos. 2C, 9, 10 and 13

7

Cyclepath between old Airdrie Bathgate railway solum and Plains Country Park access track, Plains

Between points P14 and P18

Works Nos. 2C, 9, 10 and 13

7

Cyclepath on old Airdrie Bathgate Railway solum, Plains

Between points P14 and P21

Station Road and Main Street

7

Track between Cyclepath and access and Station Road

Between points P17A and P17B

Work No.13

7

Ford Forge access, Plains

Between points P19 and P20

Works Nos. 9, 10 and 13

7, 8

Cyclepath crossing old Airdrie Bathgate Railway solum, Plains

Between points P21 and P24

Main Street

8

Ford Farm access, Plains

Between points P22 and P23

Works Nos. 9 and 10

8, 9

Cyclepath crossing old Airdrie Bathgate Railway solum between Plains and Caldercruix

Between points P24 and P25

Works Nos. 2E and 15

9, 10

Cyclepath between Caldercruix Sewage Works and Easterton Farm access road and old Airdrie Bathgate Railway solum, Caldercruix

Between points P25 and P26

Airdrie Road and Main Street

9

Footpath between Easterton Farm and Caldercruix Sewage Works access road and existing Cyclepath

Between points P25 and P25A

Work No. 2E

9

Footpath between existing Cyclepath and Easterton Farm and Caldercruix Sewage Works access road

Between points P25B and P25C

Work No. 2E

9

Footpath between existing Cyclepath and Easterton Farm and Caldercruix Sewage Works access road

Between points P25 and P25B

Work No. 2E

9

Access between Caldercruix Sewage Works and Airdrie Road (A89)

Between points P25D and P25E

Works Nos. 2E and 15

10

Track east of Caldercruix lagoons towards existing Cyclepath, Caldercruix

Between points P25F and P25G

Work No. 1D

11, 13

Cyclepath between Main Street, Caldercruix, and Hillend Sailing Club access track

Between points P27 and P28

Main Street, Airdrie Road and Work No. 20B

11

Track between existing Cyclepath and access to Main Street, Caldercruix

Between points P27A and P27B

Work No. 19

11

Footpath between existing Cyclepath and Caldercruix Bowling Green

Between points P27C and P27D

Existing road network

13

Footpath between Airdrie Road (A89) and Hillend Reservoir south shore

Between point P28A and P28B

Work No. 2F

13, 14

Cyclepath between Hillend Boat Club access track and Airdrie Road (A89) lay-by

Between points P28 and P29

Work No. 2F

14

Footpath between Airdrie Road (A89) and south shore of Hillend Reservoir

Between points P28C and P28D

Work No. 2F

14

Footpath between existing Cyclepath and south shore of Hillend Reservoir

Between points P33A and P34

Work No. 2F

14

Cyclepath between Airdrie Road (A89) lay-by and Hillend Reservoir path

Between points P29 and P30

Work No. 2F

14

Cyclepath between Hillend Reservoir path and existing Cyclepath

Between points P30 and P31

Work No. 2F

14

Footpath at south shore of Hillend Reservoir

Between points P30 and P33

Work No. 2F

14

Footpath at south shore of Hillend Reservoir

Between points P31 and P33

Work No. 2F

14

Cyclepath between path at Hillend Reservoir and Stones Path

Between points P31 and P34

Work No. 2F

14, 15

Cyclepath between Stones Path and Hillend Reservoir path, Bracco Wood

Between points P34 and P35

Work No. 2F

15

Footpath from existing Cyclepath to Bracco Wood

Between points P34A and P34B

Work No. 2F

15

Footpath from Airdrie Road (A89) to Bracco Wood

Between points P34C and P34D

Work No. 2F

15

Footpath from existing Cyclepath to south shore of Hillend reservoir

Between points P34E and P34F

Work No. 2F

15

Footpath from existing Cyclepath to Airdrie Road (A89)

Between points P35 and P35A

Work No. 2F

15

Footpath from existing Cyclepath to south shore of Hillend Reservoir

Between points P35B and P35C

Work No. 2F

15

Footpath from existing Cyclepath to south shore of Hillend Reservoir

Between points P36A and P36B

Work No. 2F

15

Cyclepath at Bracco Wood, south shore of Hillend Reservoir

Between points P35 and P36

Work No. 2F

15, 16

Cyclepath between Bracco Wood and Gatehouse access track

Between points P36 and P39

Work No. 2F

16

Access to Hillend Fishing Lodge

Between points P37 and P38

Work No. 2F

16

Cyclepath between Gatehouse access track and cyclepath route 75, Hillend

Between points P39 and P40

Work No. 2F

16, 17

Cyclepath between cyclepath route 75 and Woodside Road, Forrestfield

Between points P40 and P41

Work No. 2F

17

Cyclepath at Woodside Road, Forrestfield

Between points P41 and P42

Work No. 22B

17, 18, 19

Cyclepath between Woodside Road, Forrestfield, and Airdrie Road (A89), Bedlormie Toll

Between points P41 and P46

Work No. 2F

17

Track between existing Cyclepath and Woodside Farm field, Forrestfield

Between P41A and P41B

Works Nos. 22B and 23

19

Raiziehill Farm access track

Between points P43 and P44

Work No. 24

19

Cyclepath at Bedlormie Toll, south of Airdrie Road (A89)

Between points P45 and P46

Work No. 2F

19

Access track, Bedlormie Toll

Between points P45A and P45B

Work No. 25B

19

Track, Bedlormie Toll

Between points P46 and P46A

Work No. 25B

19, 20, 21, 22

Cyclepath between Bedlormie Toll and cyclepath route 75 at Redburn Quarry

Between points P46 and P48

Work No. 2F

20

Access, Crawberry Hill

Between points P46B and P46C

Work No. 2F

21, 22

Mosshouse Farm access

Between points P47 and P48

Works Nos. 2F and 26

22

Access track, Redburn Quarry

Between points P48 and P49

Work No. 27

22

Access track to Main Street, Blackridge

Between points P48 and P50

Works Nos. 27 and 28

22

Cyclepath, Redburn Quarry

Between points P48 and P52

Work No. 2G

22

Footpath, Redburn Quarry

Between points P48 and P53

Work No. 2G

22

Cyclepath access to Redburn Road

Between points P54 and P55

Work No. 27, Main Street and Redburn Road

22

Cyclepath, Blackridge

Between points P56 and P59

Works Nos. 2J and 29

22

Cyclepath, Blackridge

Between points P57 and P58

No alternative

22, 24

Cyclepath, Blackridge

Between points P58 and P63

Work No. 2J

24

Standhill Farm access, Blackridge

Between points P60 and P61

Work No. 29

24

Track between Standhill Farm and existing Cyclepath

Between points P60A and P60B

Work No. 29

24

Cyclepath, Blackridge

Between points P62 and P63

Work No. 2J

24

Cyclepath, Blackridge

Between points P63 and P64

Works Nos. 2J and 30B

24

Cyclepath between cyclepath route 75 and Station Road, Blackridge

Between points P64 and P65

Work No. 30A

24, 25

Cyclepath between cyclepath route 75 and old Airdrie Bathgate Railway solum, Blackridge

Between points P64 and P66

No alternative

24

Track between Station Road and existing Cyclepath

Between points P65 and P65A

No alternative

25

Cyclepath, Blackridge

Between points P66 and P67

Work No. 2K

25

Cyclepath along old Airdrie Bathgate Railway solum, Blackridge

Between points P66 and P68

Work No. 2K and Cyclepath

25

Cyclepath between track and access road to Craiginn Terrace (A89), Blackridge

Between points P68 and P69

Works Nos. 2K and 31

27

Cyclepath south of Airdrie Road (A89), Westrigg

Between points P70 and P71

Works Nos. 2L, 2M

27, 29, 30

Cyclepath between track and cyclepath route 75, Westrigg

Between points P71 and P72

Work No. 2L

29

Access between Standhill farm field and existing Cyclepath

Between points P71A and P71B

Work No. 31A

30

Footpath, Black Moss Burn

Between points P71C and P71D

Work No. 2L

30, 31

Cyclepath between cyclepath route 75 and Stonerigg Road

Between points P72 and P73

Footpath G – H

30, 31, 32

Cyclepath between cyclepath route 75 and track

Between points P72 and P78

Work No. 2N

31

Netherhouses and Westfield Farm access

Between points P74 and P75

Work No. 32

32

Footpath access to Tarrareoch farm field, Netherhouses

Between points P76 and P77

No alternative

32

Track west of Station Road (B8086), Armadale

Between points P78 and P79

Work No. 2N

32, 33

Cyclepath between track and old Airdrie Bathgate Railway solum, Armadale

Between points P78 and P85

Works Nos. 33 and 35

32, 33

Track between track and Station Road (B 8084), Armadale

Between points P79 and P80

Works Nos. 2N and 33

33

Station Road (B 8084), Armadale

Between points P81 and P82

Work No. 33

33

Cyclepath between Station Road (B 8084) and track, Armadale

Between points P83 and P84

No alternative

33

Tarrareoch Farm field access, Armadale

Between points P85 and P86

Works Nos. 33 and 34

33, 34

Cyclepath route 75, Armadale

Between points P87 and P88

Work No. 2P

34

Cyclepath route 75, Armadale

Between points P88 and P89

Work No. 2P

34

Cyclepath route 75, Armadale

Between points P88 and P90

Work No. 2P

34

Footpath off of existing Cyclepath, Armadale

Between points P88A and P88B

Work No. 2P

34

Footpath off of existing Cyclepath

Between points P88B and P88C

Work No. 2P

34

Cyclepath route 75, Armadale

Between points P89 and P90

Work No. 2P

34,35 38

Cyclepath between cyclepath route 75 and West Mains access, Armadale

Between points P90 and P91

Work No. 2P

34

Footpath off of existing Cyclepath

Between points P90A and P90B

Work No. 2P

35

Access track from the A801, Whiteside

Between points P90C and P90D

No alternative

35

Access track from the A801, Whiteside

Between points P90E and P90F

No alternative

38

Track between West Mains access and Whiteside Lane Cottage access

Between points P91 and P92

Existing road network

38

Cyclepath route 75, Whiteside

Between points P91 and P93

Works Nos. 2P, 2Q

38

Cyclepath between cyclepath route 75 and Teepit Hill

Between points P93 and P94

Work No. 2P

38, 39

Cyclepath between Teepit Hill and Playground at Birniehill Crescent

Between points P93 and P96

Works Nos. 2Q, 2R

39, 40

Cyclepath between cyclepath route 75 and path adjacent to Birniehill Avenue and Whiteside, Bathgate

Between points P95 and P99

Birniehill Avenue and Work No. 2S

39

Access to Cyclepath from Birniehill Avenue and Birniehill Crescent, Bathgate

Between points P95 and P96

Works Nos. 2R, 2Q

39

Access between Whiteside Industrial Estate and Birniehill Avenue

Between points P96A and P96B

Work No. 2R

39, 40

Footpath between cyclepath and access track off Factory Road, Bathgate

Between points P95 and P98

No alternative

40

Track between factory Road and Birniehill Avenue

Between points P97 and P98

Work No. 39B

40

Footpath between existing Cyclepath and Whitburn Road (B7002)

Between points P98A and P98B

Work No. 2S

40

Footpath south of Whiteside, Bathgate

Between points P99 and P100

Works Nos. 2S and 39B

40

Cyclepath between path and Whitburn Road (B 7002), Bathgate

Between points P99 and P103

Works Nos. 2S and 39B

40

Cyclepath route 75, Bathgate

Between points P101 and P102

Work No. 2S

40

Cyclepath route 75, Bathgate

Between points P101 and P103

No alternative

40

Cyclepath route 75, Bathgate

Between points P102 and P104

Work No. 2S

40, 41

Cyclepath between cyclepath route 75 and Whitburn Road (B 7002), Bathgate

Between points P104 and P105

Works Nos. 2S and 39B

41

Foundry access, Bathgate

Between points P106 and P107

Work No. 40

41

Bathgate Golf Course access road, Bathgate

Between points P108 and P109

Works Nos. 40 and 43

41

Bathgate Golf Course access road, Bathgate

Between points P109 and P110

Works Nos. 40, 43

41

Bathgate Golf Course access road, Bathgate

Between points P109 and P111

Work No. 40

43

Rennie's Overbridge, Bathgate

Between points P111A and P111B

No alternative

46

Track south-east of the A7066, Bog Hall

Between points P114 and P115

No alternative

47

Footbridge carrying footpath over existing railway solum, Livingston

Between points P116 and P117

Work No. 47B

48

Footpath to Waverley Crescent and Raeburn Rigg, Livingston

Between points P118 and P119

Deans North Road

50

Track to Deer Park Golf Course

Between points P120 and P121

Morrison Way, Works Nos. 49A, 49B

57

Track north-west of Hilwood House and Linden House, Edinburgh

Between points P122 and P123

Harvest Road

Part 2Roads to be temporarily stopped up

Sheet of Parliamentary plans

Road to be stopped up

Extent of stopping up

(1)

(2)

(3)

3

Carlisle Road (A73), Airdrie

Between points T5 and T6

4

Crowwood Drive, Clarkston

Between points T7 and T8

4

Old Bore Road, Clarkston

Between points T9 and T10

4

Clarkston Drive, Clarkston

Between points T11 and T12

4

Towers Road, Clarkston

Between points T13 and T14

4, 5

Footpath between Towers Road and Katherine Park, Drumgelloch

Between points T15 and T16

5

Footpath to Katherine Park from Forrest Street (A 89), Clarkston

Between points T16A and T16B

5

Katherine Park Lane , Clarkston

Between points T17 and T18

7

Brownieside Road and Station Road, Plains

Between points T19 and T20

8

Airdrie Road (A89), Plains

Between points T21 and T22

9

Caldercruix Sewage Works and Easterton Farm access road, Caldercruix

Between points T23 and T24

11

Main Street, Caldercruix

Between points T25 and T26

11

Main Street, Caldercruix

Between points T27 and T28

12, 13

Cyclepath between Gowan Brae, Caldercruix, and Hillend Sailing Club car park

Between points T29 and T30

13

Hillend Sailing Club access

Between points T31 and T32

16

Hillend Angling Club access

Between points T32A, T32B and T32C

16

Gatehouse access track, Hillend

Between points T33 and T34

17

Woodside Road, Forrestfield

Between points T35 and T36

19

Airdrie Road (A89), Bedlormie Toll

Between points T37 and T38

20

Field access, Crawberry Hill

Between points T39 and T40

21

Mosshouse field access

Between points T41 and T42

24

Millbank Quarry Road/Station Road, Blackridge

Between points T43 and T44

24

Westcraig Road/Harthill Road (B718), Blackridge

Between points T45 and T46

24, 25

Cyclepath, Blackridge

Between points T47 and T48

25, 27

Cyclepath, Blackridge

Between points T48A and T48B

27

Track, Westrigg

Between points T48C and T48D

30, 31

Stonerigg Road, Armadale

Between points T50 and T51

32

Track, Armadale

Between points T52 and T53

33

Footpath, Armadale

Between points T54 and T55

33

Footpath, Armadale

Between points T56 and T57

33

Access to Tarrareoch Farm and Farm House and Honeysuckle Cottage, Armadale

Between points T58 and T59

34, 35

Track, Armadale

Between points T60 and T61

35

Track, Whiteside

Between points T62 and T63

38, 39

Path, Bathgate

Between points T63A and T63B

40

Whitburn Road (B7002), Bathgate

Between points T64 and T65

41

Track, Bathgate

Between points T66 and T67

43, 44

Cyclepath, Bathgate

Between points T67A and T67B

44

Footpath, Boghall

Between points T68 and T69

44

Footpath, Boghall

Between points T68 and T72

44, 45

Cyclepath, Boghall

Between points T70 and T71

47

Deans North Road, Livingston

Between points T73 and T74

49

Camps Rigg footpath, Livingston

Between points T75 and T76

49

Footpath, Livingston

Between points T76 and T80

49

Footpath, Livingston

Between points T77 and T80

49

Footpath, Livingston

Between points T78, T100, T101, T102 and T82

49

Footpath, Livingston

Between points T79 and T100

49

Footpath, Livingston

Between points T80and T101

49

Footpath, Livingston

Between points T81 and T102

49

Footpath, Livingston

Between points T83 and T84

49

Footpath, Livingston

Between points T85 and T86

49

Footpath, Livingston

Between points T103 and T104

49

Footpath, Livingston

Between points T104 and T105

50

The Loan Path, Livingston

Between points T87 and T88

51

Footpath, Houstoun Industrial Estate, Livingston

Between points T89 and T90

51

Footpath, Houstoun Industrial Estate, Livingston

Between points T89 and T91

52

Station Road and Pumpherston Road, Uphall

Between points T91A and T91B

53

Station Road, Drumshoreland Muir

Between points T91C and T91D

58

Track, Norton Mains

Between points T92 and T93

59

Roddinglaw Road, Roddinglaw

Between points T94 and T95

60

Gogar Station Road, Gogar

Between points T96 and T97

60

Track, Gogar Burn

Between points T98 and T99

SCHEDULE 4Private crossings

(introduced by section 11)

Part 1Continuing private crossings

Local government area

Sheet of Parliamentary plans

Road

(1)

(2)

(3)

North Lanarkshire

5

Wester Moffat Farm overbridge, Clarkston

North Lanarkshire

10

Caldercruix Farm underbridge, Caldercruix

North Lanarkshire

13

Hillend Sailing Club overbridge, Hillend

North Lanarkshire

19

Raiziehill Farm overbridge, Blackridge

West Lothian

20

Bedlormie Farm overbridge, Crawberry Hill

West Lothian

21

Mosshouse Farm overbridge, Crawberry Hill

West Lothian

22

Bogend Farm overbridge, Blackridge

West Lothian

24

Standhill Farm overbridge, Blackridge

West Lothian

24

Millbank Quarry road overbridge, Blackridge

West Lothian

51

Houstoun Industrial Estate footbridge, Livingston

City of Edinburgh

58

Norton Mains Farm overbridge, Edinburgh

Part 2Discontinued private crossings

Local government area

Sheet of Parliamentary plans

Road

(1)

(2)

(3)

North Lanarkshire

5

Unnamed at grade crossing east of Wester Moffat Farm

North Lanarkshire

5, 6

Unnamed at grade crossing adjacent to St. Phillips School, Plains

North Lanarkshire

6

Unnamed at grade crossing east of, St. Phillips School, Plains

North Lanarkshire

7

At or around 132-139 Main Street private access, Plains

North Lanarkshire

7

At or around 140-152 Main Street private access, Plains

North Lanarkshire

7

At or around 153-172 Main Street private access, Plains

North Lanarkshire

7

Ford Farm / Ford Forge private access, Plains

North Lanarkshire

8

Ford Farm private access, Plains

North Lanarkshire

8

Stepends Farm private access, Plains

North Lanarkshire

8

Barblues crossing, Plains

North Lanarkshire

9

Rockbank Farm crossing, Caldercruix

North Lanarkshire

9

Rockbank Farm crossing, Caldercruix

North Lanarkshire

10

Holm Farm private access, Caldercruix

North Lanarkshire

10

Drumbow Homes / Tusker Developer Ltd. private access, Caldercruix

North Lanarkshire

16

Hillend Angling Club level crossing

North Lanarkshire

17

At or around Ardenlea Cottage, Airdrie Road private access, Forrestfield

North Lanarkshire

17

At or around Lochview, Airdrie Road private access, Forrestfield

North Lanarkshire

17

At or around 71 Airdrie Road private access, Forrestfield

North Lanarkshire

17

At or around Daisy Cottage, Airdrie Road private access, Forrestfield

North Lanarkshire

17

At or around Arth-Leen Cottages Airdrie Road private access, Forrestfield

North Lanarkshire

17

At or around Forrestfield Garage, Airdrie Road private access, Forrestfield

North Lanarkshire

18

Unnamed crossing at Forrestfield Wood

North Lanarkshire

19

Forrest Farm crossing, Crawberry Hill

West Lothian

20

Bedlormie Mains Farm private access, Crawberry Hill

West Lothian

21

Mosshouse Farm access to railway solum, Blackridge

West Lothian

21

Field access south-east of Mosshouse Farm Farmhouse, Blackridge

West Lothian

22

Unnamed crossing at Redburn Quarry

West Lothian

25

Westercraigs Farm crossing, Blackridge

West Lothian

27

Westercraigs Farm private access, Westrigg

West Lothian

25

Hardhill Farm private access

West Lothian

29

Standhill Farm level crossing, Woodend Junction

West Lothian

30

Standhill Farm private access

West Lothian

31

Netherhouses and Westfield Farm access to solum and Stonerigg Road, west of Armadale

West Lothian

31

Netherhouses and Westfield Farm private access east of Stonerigg Road, west of Armadale

West Lothian

32

Tarrareoch Farm level crossing, west of Station Road (B8084)

West Lothian

33

Cappers Farm Cottages private access, Armadale

West Lothian

33

Tarrareoch Farm level crossing, Armadale, east of Station Road, (B8084)

West Lothian

34

Tarrareoch Farm level crossing, Armadale, west of A801

West Lothian

35

Whiteside Farm level crossing, Whiteside

West Lothian

35

West Mains Farm level crossing, Whiteside

West Lothian

38

Whiteside Lane Cottages private access

West Lothian

38

Whiteside Industrial Estate private access

West Lothian

39

Whiteside Industrial Estate crossing

West Lothian

40

Birniehill Avenue private access, Bathgate

West Lothian

40

At or around 96-90 Whiteside private access, Bathgate

West Lothian

40

At or around 93-96 Whiteside private access, Bathgate

West Lothian

40

At or around 89-92 Whiteside private access, Bathgate

West Lothian

40

At or around 81-88 Whiteside private access, Bathgate

West Lothian

40

At or around 73-80 Whiteside private access, Bathgate

West Lothian

40

At or around 65-72 Whiteside private access, Bathgate

West Lothian

40

At or around 59-64 Whiteside private access, Bathgate

West Lothian

40

At or around 49-58 Whiteside private access, Bathgate

SCHEDULE 5Acquisition of land, etc. outside limits of deviation

(introduced by sections 17 and 19)

Part 1Acquisition of land

Location

Sheet of Parliamentary plans

Number of land shown on plans

Purposes for which land to be acquired

(1)

(2)

(3)

(4)

In the local government area of North Lanarkshire—

Airdrie Station

1

3B, 5

Station improvements

Airdrie Station

1

6

Provision of layby

Sundial, Clarkston

4

49

Removal of sundial

Near Sundial, Clarkston

4

50A

Installation of railway equipment

Near Sundial, Clarkston

4

51

Relocation of sundial

Between Grant Court and Forrest Street, Clarkston

4

62

Provision of footpath

West of Station Road, Clarkston Airdrie

4

63A

Station and car park

Station Road, Clarkston

4

65

Road improvements

Caldervale Forge, Clarkston

4

66, 67, 69

Provision of footpath

Forrest Street, Clarkston

4

72, 73

Provision of laybys

Station Road, Clarkston

4

74

Environmental mitigation

Main Street, Plains

7

172A, 173A, 174A, 175A

Mitigation

Lagoons (settlement tanks), Caldercruix

10

249A

Station car park

Station Road, Caldercruix

10, 11

276A

Provision of station access

Millstream Crescent, Caldercruix

11

277A, 277B, 277F, 277E, 277D

Mitigation

Bracco Wood, Hillend Reservoir, Caldercruix

15, 16

361

Provision of angling jetty

Hillend Angling Club, Hillend Reservoir, Caldercruix

16

365A, 365B, 365C

Provision of angling club car park and access

Hillend Angling Club, Hillend Reservoir, Caldercruix

16

367, 367A, 367B

Provision of angling club bus and car park

Land and house, Bedlormie Toll Cottage

19

428A

Mitigation

In the local government area of West Lothian—

Barbauchlaw Burn, Blackridge

22

462B

Provision of cyclepath

Redburn Quarry, Blackridge

22

462

Provision of cyclepath

Redburn Quarry, Blackridge

22

478A

Provision of footpath

Blackridge Farm, Blackridge

22

479A

Provision of footpath

Barbauchlaw Burn, Blackridge

22

488, 488A

Provision of footpath

Barbauchlaw Burn, Blackridge

22, 24

489

Provision of footpath

East of Barbauchlaw Burn, Blackridge

22

492

Provision of footpath

Standhill Farm, Blackridge

24

497

Provision of footpath

Blackmoss Burn, Blackridge

30

574, 575

Provision of footpath

East of Black Moss Burn, Blackridge

30, 31

579

Provision of footpath

Stonerigg Road, Armadale

31

598A

Provision of footpath

Springfield Farm, Armadale

32, 33

626

Provision of footpath

The Snab, Station Road, Armadale

33

651

Provision of footpath

Tarrareoch Farm, Armadale

33

661A

Provision of station and car park

Trees Farm and West Mains Farm, Armadale

33, 34, 35

666A

Ground stabilisation

Woodland, Armadale

35

684A

Provision of feeder station

Whitburn Road (B7002), Bathgate

38

700A

Provision of access track

Whitburn Road (B7002), Bathgate

40

756

Provision of footpath

Whitburn Road (B7002), Bathgate

40, 41

757

Provision of footpath

West of Bog Burn Bridge, Bathgate

41

758

Provision of footpath

Industrial Estate, Edinburgh Road, Bathgate

42

786A

Provision of station and car park

Edinburgh Road, Bathgate

42

789

Provision of station and car park

Cyclepath south of operational railway, Bathgate

43, 44

811A

Ground stabilisation

Road (A7088), Bathgate

44

826A

Ground stabilisation

The Bog Burn, Bathgate

44, 46

840

Provision of car depot

Boghall Farm, Bathgate

46

849

Demolition of bridge

Luggie Bridge, Livingston

48

911

Demolition of bridge

Knightsridge Bridge, Livingston

50

937

Demolition of bridge

M8 Motorway, Uphall

52

990

Provision of station car park

Uphall Station

52

998

Station improvements

Station Road Bridge, Uphall

52

1003

Bridge replacement

Station Road, Drumshoreland Station

53

1017

Bridge replacement

Birdsmill Viaduct

54

1025, 1029

Provision of overhead masts and equipment

In the local government areas of West Lothian and the City of Edinburgh—

Birdsmill Viaduct

54

1026, 1030

Provision of overhead masts and equipment

In the local government area of the City of Edinburgh—

Birdsmill Viaduct

54

1027, 1031

Provision of overhead masts and equipment

Harvest Road, Edinburgh

57

1041

Provision of footpath

Hillwood, Ratho

57

1048

Demolition of bridge

Part 2Acquisition of permanent rights

Location

Sheet of Parliamentary plans

Number of land shown on Parliamentary plans

Purpose for which rights may be permanently acquired

(1)

(2)

(3)

(4)

In the local government area of North Lanarkshire—

Airdrie Station

1

3, 3A, 3F, 3G

Construction and maintenance of station facilities

Easterton Farm, Caldercruix

9

225A

Access for construction and thereafter for maintenance

Station Road, Caldercruix

10

265

Provision of cylcepath and station access

Main Street, Caldercruix

10, 11

267

Provision of cyclepath and station access

Hillend Reservoir, Caldercruix

13

320A

Access for construction and thereafter for maintenance

In the local government area of West Lothian—

Redburn Quarry, Blackridge

22, 23

466A

Access for construction and thereafter for maintenance

Wester Torrance Farm, Blackridge

25

549, 551

Upgrade of existing path and thereafter provision of cyclepath

Westriggs Colliery, Blackridge

25

550

Upgrade of existing path and thereafter provision of cyclepath

Westriggs Colliery, Blackridge

25, 27

552A

Upgrade of existing path and thereafter provision of cyclepath

Barbauchlaw Burn, Westrigg, Blackridge

25, 26

554

Access for construction and thereafter for maintenance

Standhill Farm, Blackridge

27, 28, 29

557

Access for construction and thereafter for maintenance

Netherhouses and Westfield Farm, Armadale

31

607

Provision of turning space

Netherhouses and Westfield Farm, Armadale

31

615

Provision of turning space

Tarrareoch Farm, Armadale

33

659A

Provision of drainage facilities and provision of access for maintenance

Armadale

35

679

Installation and provision of electricity supply and thereafter access for maintenance

Armadale

35, 36, 37

680

Installation and provision of electricity supply and thereafter access for maintenance

Armadale

37

681, 682, 683

Installation and provision of electricity supply and thereafter access for maintenance

West Mains Farm, Bathgate

38

691

Access to feeder station

Access to Whiteside Cottage, Bathgate

38

696

Provision of turning space

Golf Club, Bathgate

42

784

Access for construction and thereafter for maintenance

Blackburn Road (B793), Bathgate

43

807

Replacement of bridge parapets

Road (A7066), Bathgate

44

833

Replacement of bridge parapets

Starlaw Road, Bathgate

46

859

Replacement of bridge parapets

M8 Motorway, near Bathgate

46

868

Replacement of bridge parapets

Deans Road, Livingston

47

877

Replacement of bridge parapets

Livingston North Station

48

894, 901

Access for construction and thereafter for maintenance

Livingston North Station

48

894A, 894B

Construction and maintenance of station improvements

Deans South, Livingston

48

899

Replacement of bridge parapets

Knightsridge West Bridge, Livingston

49

927

Replacement of bridge parapets

Nettlehill Bridge, Livingston

51

962

Replacement of bridge parapets

M8 Motorway slip road bridge, Livingston

51

964

Replacement of bridge parapets

Houstoun Industrial Estate, Livingston

51

980

Access for construction and thereafter for maintenance

Houstoun Industrial Estate, Livingston

51

986

Access for construction and thereafter for maintenance

Uphall Station

52

995A

Construction and maintenance of station improvements

Birdsmill Viaduct

54

1035A

Provision of turning space

In the local government areas of West Lothian and the City of Edinburgh—

Birdsmill Viaduct

54

1028

Provision of overhead masts and equipment

Birdsmill Viaduct

54, 55

1035

Access for construction and thereafter for maintenance

In the local government area of the City of Edinburgh—

Hillwood, Ratho

57

1045, 1046A

Access for construction and thereafter for maintenance

Norton Mains

58

1054, 1056

Access for construction and thereafter for maintenance

Fairview, Gogarburn

60

1106

Access for construction and thereafter for maintenance

Sauchiebank, off Russell Road, Edinburgh

61

1107

Access for construction and thereafter for maintenance

Part 3Acquisition of temporary rights

Location

Sheet of Parliamentary plans

Number of land shown on Parliamentary plans

Purposes for which rights may be temporarily acquired

Authorised work

(1)

(2)

(3)

(4)

(5)

In the local government area of North Lanarkshire—

Wester Moffat Farm, Wester Moffat

5

97A, 97B

Access for construction

Works Nos. 8A, 8B

Stepends Farm, Plains

8

189, 190

Access for construction

Works Nos. 1, 14

Millstream Crescent, Caldercruix

11

277C

Access for construction

Works Nos. 1, 19

In the local government area of West Lothian—

Inch Wood, Bathgate

44

821

Provision of footpath between points N and P

Works Nos. 44, 45Footpath between points N and P

SCHEDULE 6Land of which temporary possession may be taken

(introduced by section 21)

Location

Sheet of Parliamentary plans

Number of land shown on plans

Purposes for which temporary possession may be taken

Authorised work

(1)

(2)

(3)

(4)

(5)

In the local government area of North Lanarkshire—

Carlisle Road (A73), Airdrie

3

30, 31, 35, 36

Construction compound, working space and access

Work No. 4

Scrap yard, Carlisle Road (A73), Airdrie

3

38, 39

Construction compound and working space

Works Nos. 1, 4

Crowwood Drive, Airdrie

4

41, 42, 47

Construction compound and working space

Replacement of bridge parapets for overbridge 240/059B (Crowwood Drive)

Crowwood Drive, Airdrie

4

43, 45

Working space

Replacement of bridge parapets for overbridge 240/059B (Crowwood Drive)

Drumclair Place, Airdrie

4

46

Construction compound and working space

Replacement of bridge parapets for overbridge 240/059B (Crowwood Drive)

Stepends Farm, Plains

8

188

Construction compound

Works Nos. 1, 14

Rockbank Farm, Caldercruix

8

199

Farm access

Work No. 14

Rockbank Farm, Caldercruix

9

239

Construction compound

Works Nos. 1, 2E, 15

Lagoons (settlement tanks), Caldercruix

10

244A

Ground treatment

Works Nos. 1, 2E

Easterton Farm, Caldercruix

10

254A

Working space

Works Nos. 1, 1D, 2E

Braefoot Court, Caldercruix

10

258, 259, 260, 261

Stabilisation works

Work No. 1

North of cyclepath, Caldercruix

10

262A

Stabilisation works

Work No. 1

Gas Governor, Main Street, Caldercruix

11

292

Diversion of gas main

Work No. 19

Limelands, Caldercruix

11

294

Working space

Work No. 1

North of Hillend Road, Caldercruix

11, 13

304A

Construction compound

Works Nos. 1, 2F, 20A, 20B

North of Hillend Road, Caldercruix

13

305A

Construction compound

Works Nos. 1, 2F, 20A, 20B

Hillend Reservoir, Caldercruix

13

323A

Stabilisation works

Work No. 2F

Hillend Reservoir, Caldercruix

16

363

Working space

Work No. 2F

Forrestfield, Caldercruix Wood, Airdrie Road

18

407

Construction compound

Works Nos. 1, 2F

Popcorn Factory, Raiziehill Farm

19

422A

Ground stabilisation

Works Nos. 1, 2F, 24

In the local government area of West Lothian—

Crawberry Hill Bridge, Blackridge

20

440, 442

Working space

Works Nos. 1, 2F

Redburn Quarry, Blackridge

22

462A

Working space

Works Nos. 1, 2G, 27, 28

Redburn Quarry, Blackridge

22

478, 479

Construction compound

Works Nos. 1, 2G, 27, 28

Standhill Farm, Blackridge

24

508

Construction compound

Works Nos. 1, 2J, 29, 30A, 30B

Westercraigs Farm, Blackridge

25, 26, 27

553

Construction compound and working space

Work No. 1

Westrigg Colliery, Blackridge

27, 29

562

Construction compound and working space

Works Nos. 1, 2L, 31A

Netherhouses and Westfield Farm, Armadale

31

600

Construction compound

Works Nos. 1, 2N, 32

Netherhouses Wood, Armadale

31

604

Working space

Works Nos. 1, 2N, 32

Netherhouses and Westfield Farm, Armadale

31

607

Working space

Works Nos. 1, 2N, 32

Netherhouses and Westfield Farm, Armadale

31

608A, 609, 610, 611

Working space

Works Nos. 1, 2N, 32

Netherhouses and Westfield Farm, Armadale

31

615

Working space

Works Nos. 1, 2N, 32

Netherhouses Cottage and Netherhouses Farm, Armadale

31

616

Working space

Works Nos. 1, 2N, 32

Springfield Farm, Armadale

32, 33

627

Working space

Works Nos. 1, 2N, 33, 34

Tarrareoch Farm, Armadale

32

628

Working space

Works Nos. 1, 2N, 33, 34

Tarrareoch Farm, Armadale

32, 33

654

Construction compound and working space

Works Nos. 1, 2N, 33, 34

Tarrareoch Farm, Armadale

33

659A

Working space

Work No. 1E

West Mains Farm, Bathgate

38

693, 694

Working space

Works Nos. 1, 2P, 38

Access to Whiteside Cottage, Bathgate

38

695

Working space

Works Nos. 1, 2P, 38

Access to Whiteside Cottage, Bathgate

38

696

Working space

Works Nos. 1, 2P, 38

Birniehill Road, Bathgate

40

723

Working space

Works Nos. 1, 2S, 39A, 39B

Whitburn Road (B7002), Bathgate

40

727

Working space

Works Nos. 1, 2S, 39A, 39B

Bog Burn, Bathgate

41

764

Working space

Works Nos. 1, 2S

Foundry, Bathgate

41

768

Working space

Works Nos. 1, 40, 41, 42

Bathgate Station

41

781, 782A

Construction compound and working space

Works Nos. 1, 40, 43

Rennie's Bridge, Bathgate

43

790, 791, 792, 793, 796, 797

Working space

Works Nos. 1A, 1AADemolition of overbridge 240/030 (Rennie's Bridge)

Blackburn Road (B782), Guildiehaugh, Bathgate

43

802, 803, 804, 805, 806, 808, 809, 810, 811

Working space

Replacement of bridge parapets for overbridge 240/029 (Blackburn Road)

Hunter Grove, Bathgate

44

815

Access for construction

Demolition and relocation of overbridge 240/028 (Inch Farm)

Hunter Grove, Bathgate

44

822

Working space

Works Nos. 44, 45Demolition and relocation of overbridge 240/028 (Inch Farm)

West of A7088, Bathgate

44

826

Working space

Work No. 44Demolition and relocation of overbridge 240/028 (Inch Farm)

Road (A7066) Bathgate

44

829, 830, 831, 832, 834, 835, 836, 837, 838

Working space

Replacement of bridge parapets for overbridge 240/027A (Bathgate Branch Railway Bridge)

Boghall Farm, Bathgate

46

841, 842

Access for construction

Demolition of overbridge 240/027 (Boghall Farm)

Road (A7066), Bathgate

46

843

Construction compound and working space

Demolition of overbridge 240/027 (Boghall Farm)

Boghall Farm, Bathgate

46

844, 845, 846, 847, 848, 850, 851, 852

Working space

Demolition of overbridge 240/027 (Boghall Farm)

Starlaw Road, Bathgate

46

855, 856, 857, 858, 860, 861, 862, 863

Working space

Replacement of bridge parapets for overbridge 240/025A (Starlaw Road)

M8 Motorway, near Bathgate

46

864, 865, 866, 867, 869, 870, 871, 872

Working space

Replacement of bridge parapets for overbridge 240/024C (M8)

Dean's Road, Livingston

47

873, 874, 875, 876, 878, 879, 880, 881

Working space

Replacement of bridge parapets for overbridge 240/021A (Deans Road)

Station Road, Livingston

47

882

Working space

Works Nos. 47A, 47B

Barracks Roundabout, Houstoun Road West, Livingston

47

889

Construction compound and working space

Works Nos. 47A, 47B

Livingston North Station, Livingston

48

895, 896, 898, 897, 900, 900A, 902, 903, 904, 905

Working space

Replacement of bridge parapets for overbridge 240/018C (Deans East)

Newyearfield Strip, Livingston

48

906

Construction compound and working space

Replacement of bridge parapets for overbridge 240/018C (Deans East)Demolition of overbridge 240/018 (Luggie)

Newyearfield Strip, Livingston

48

907

Construction compound

Replacement of bridge parapets for overbridge 240/018C (Deans East)Demolition of overbridge 240/018 (Luggie)

Raeburn Rigg, Livingston

48

908, 909, 910

Working space

Demolition of overbridge 240/018 (Luggie)

Waverley Crescent, Livingston

48

912, 913, 914

Working space

Demolition of overbridge 240/018 (Luggie)

Livingston

49

922A

Construction compound

Works Nos. 48A, 48B

Replacement of bridge parapets for overbridge 240/016B (Knightsridge West)Demolition of overbridge 240/016 (Knightsridge)

Sutherland Way, Livingston

49

922B

Access for construction

Works Nos. 48A, 48B

Replacement of bridge parapets for overbridge 240/016B (Knightsridge West)Demolition of overbridge 240/016 (Knightsridge)

Knightsridge West Road, Livingston

49

923, 924, 925, 926, 928, 929, 930, 931, 932

Working space

Replacement of bridge parapets for overbridge 240/016B (Knightsridge West)

Deer Park Golf Course, Livingston

50

933, 934, 935, 936, 938, 939, 940

Working space

Demolition of overbridge 240/016 (Knightsridge)

Morrison Way, Livingston

50

941, 953, 954

Working space

Demolition of overbridge 240/016 (Knightsridge)

Morrison Way, Livingston

50

942

Construction compound and working space

Demolition of overbridge 240/016 (Knightsridge)

Deer Park Golf Course, Livingston

50

943

Construction compound and working space

Works Nos. 49A, 49B

Fairways Business Park, Livingston

50

955

Construction compound and working space

Works Nos. 49A, 49B

Livingston East Roundabout, Livingston

51

956, 957, 958, 959, 960, 961, 963, 965, 966, 967, 968

Working space

Replacement of bridge parapets for overbridge 240/014A (M8 Motorway sliproad)

Replacement of bridge parapets for overbridge 240/014B (Nettlehill Railway Bridge)

Replacement of bridge parapets for overbridge 240/014C (Nettlehill Railway Bridge)

Livingston East Roundabout, Livingston

51

969

Working space

Replacement of bridge parapets for overbridge 240/014A (M8 Motorway sliproad)

Replacement of bridge parapets for overbridge 240/014B (Nettlehill Railway Bridge)

Livingston East Roundabout, Livingston

51

970

Working space

Replacement of bridge parapets for overbridge 240/014C (Nettlehill Railway Bridge)

Houstoun Industrial Estate, Livingston

51

983, 984

Working space and access

Work No. 50

Houstoun Industrial Estate, Livingston

51

987

Construction compound

Work No. 50

Station Road, Uphall

52

999, 1000, 1001, 1002, 1004, 1005

Working space

Deck replacement underbridge 240/013 (Pumpherston Road)

Uphall Station

52

1006

Working space

Deck replacement underbridge 240/013 (Pumpherston Road)

Drumshoreland Station

53

1008, 1015

Construction compound and working space

Deck replacement underbridge 240/008 (Drumshoreland Station)

Drumshoreland Station

53

1009, 1010, 1011, 1012, 1013, 1014, 1016, 1018, 1019, 1020, 1021

Working space

Deck replacement underbridge 240/008 (Drumshoreland Station)

Birdsmill Viaduct

54

1022

Construction compound and working space

Provision of overhead masts and equipment at underbridge 240/004 (Birdsmill)

Birdsmill Viaduct

54

1032

Working space

Provision of overhead masts and equipment at underbridge 240/004 (Birdsmill)

In the local government areas of West Lothian and the City of Edinburgh—

Birdsmill Viaduct

54

1023, 1033

Working space

Provision of overhead masts and equipment at underbridge 240/004 (Birdsmill)

In the local government area of the City of Edinburgh—

Birdsmill Viaduct

54

1024, 1034

Working space

Provision of overhead masts and equipment at underbridge 240/004 (Birdsmill)

Hillwood, Ratho

57

1039, 1040, 1042, 1044, 1047, 1049, 1050, 1051, 1052

Working space

Demolition of overbridge 070/012 (Harvest Road Footbridge) Footpath between points S and T

Hillwood, Ratho

57

1043

Access for construction

Demolition of overbridge 070/012 (Harvest Road Footbridge) Footpath between points S and T

Hillwood, Ratho

57

1046

Construction compound

Demolition of overbridge 070/012 (Harvest Road Footbridge) Footpath between points S and T

Norton Mains

58

1053

Construction compound

Works Nos. 54A, 54B

Norton Mains

58

1057, 1061, 1065, 1069

Working space

Works Nos. 54A, 54B

Roddinglaw

59

1070, 1071

Working space

Works Nos. 55A, 55B

Roddinglaw

59

1072

Access for construction

Works Nos. 55A, 55B

Roddinglaw

59

1073, 1080

Construction compound and working space

Works Nos. 55A, 55B

Gogarburn Farm, Gogarburn

60

1084, 1091

Construction compound and working space

Works Nos. 56A, 56B

Gogarburn

60

1095, 1102

Construction compound and working space

Works Nos. 57A, 57B

SCHEDULE 7Statutory undertakers, etc.

(introduced by section 40)

Apparatus of statutory undertakers, etc. on land acquired

1

1

Subject to the provisions of this schedule, sections 224 to 227 of the 1997 Act (power to extinguish rights of statutory undertakers, etc. and power of statutory undertakers, etc. to remove or re-site apparatus) shall apply in relation to any land which has been acquired under this Act, or which is held by the authorised undertaker and is appropriated or used (or about to be used) by it for the purposes of this Act or for purposes connected with this Act.

2

All such other provisions of the 1997 Act as apply for the purposes of the provisions applied by paragraph 1 above (including sections 228 to 231, which contain provisions consequential on the extinguishment of any rights under sections 224 and 225, and sections 232(2) to (4), 233 and 235, which provide for the payment of compensation) shall have effect accordingly.

3

In the provisions of the 1997 Act, as applied by sub-paragraphs (1) and (2) above—

a

references to the purpose of carrying out any development with a view to which land was acquired or appropriated are references to the purpose of carrying out the authorised works; and

b

references to land acquired or appropriated as mentioned in section 224(1) of the 1997 Act are references to land acquired, appropriated or used as mentioned in sub-paragraph (1) above.

4

Where any apparatus of a utility undertaker or of a public communications provider is removed in pursuance of a notice or order given or made under section 224, 225 or 226 of the 1997 Act, as applied by sub-paragraph (1) above, any person who is the owner or occupier of premises to which a supply was given from that apparatus shall be entitled to recover from the authorised undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.

5

Sub-paragraph (4) above shall not apply in the case of the removal of a public sewer, but where such a sewer is removed in pursuance of such a notice or order as is mentioned in that paragraph, any person who is—

a

the owner or occupier of premises the drains of which communicated with that sewer; or

b

the owner of a private sewer which communicated with that sewer,

shall be entitled to recover from the authorised undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the person's drain or sewer communicate with any other public sewer or with a private sewage disposal plant.

6

The provisions of the 1997 Act mentioned in sub-paragraphs (1) and (2) above, as applied by those sub-paragraphs, shall not have effect in relation to apparatus as respects which Part IV of the 1991 Act applies.

7

In this paragraph—

  • gas transporter” has the meaning given by section 7(1) of the Gas Act 1986 (c. 44);

  • public communications provider” has the meaning given by section 151(1) of the Communications Act 2003 (c. 21); and

  • utility undertaker” means a person who is—

    1. a

      authorised by any enactment to carry on an undertaking for the supply of water;

    2. b

      a gas transporter; or

    3. c

      the holder of a licence under section 6 of the Electricity Act 1989 (c. 29),

    and who is, or is deemed to be, a statutory undertaker within the meaning of section 214 of the 1997 Act.

Apparatus of statutory undertakers, etc in stopped up roads

2

1

Where a road is stopped up under section 10 of this Act any statutory undertaker whose apparatus is under, in, upon, over, along or across the road shall have the same powers and rights in respect of that apparatus, subject to the provisions of this paragraph, as if this Act had not been passed.

2

Where a road is stopped up under section 10 of this Act any statutory undertaker whose apparatus is under, in, upon, over, along or across the road may, and if reasonably requested to do so by the authorised undertaker, shall—

a

remove the apparatus and place it or other apparatus provided in substitution for it in such other position as the statutory undertaker may reasonably determine and have power to place it; or

b

provide other apparatus in substitution for the existing apparatus and place it in such a position.

3

The allowable costs of the relocation works shall be—

a

determined in accordance with section 144 (Sharing costs of necessary measures) of the 1991 Act and any regulations for the time being having effect under that section (as having effect by virtue of section 13 of this Act); and

b

borne by the authorised undertaker and the statutory undertaker in such proportions as may be prescribed by any such regulations.

4

In this paragraph—

  • apparatus” has the same meaning as in Part IV of the 1991 Act;

  • relocation works” means works executed, or apparatus provided, under sub-paragraph (2); and

  • statutory undertaker” has the same meaning as in the Roads (Scotland) Act 1984 (c. 54).

SCHEDULE 8Listed buildings

(introduced by section 42)

1

1

Subject to sub-paragraph (2), if a listed building was such a building immediately before 17th January 2006 and is specified in columns (1), (2) and (3) of the following table—

a

section 6 of the Listed Buildings Act (restriction on works affecting listed buildings) shall not apply to works carried out in relation to the building in exercise of the powers conferred by Part 1 of this Act;

b

to the extent that a notice issued in relation to the building under section 34(1) of that Act (enforcement) requires the taking of steps which would be rendered ineffective, or substantially ineffective, by works proposed to be carried out in exercise of the powers conferred by Part 1 of this Act, it shall not have effect or, as the case may be, shall cease to have effect;

c

no steps may be taken in relation to the building under section 38(1) of that Act (execution of works specified in notice under section 34(1)) which would be rendered ineffective, or substantially ineffective, by such works as are mentioned in paragraph (b) above; and

d

no works may be executed for the preservation of the building under section 49 of that Act (urgent works to preserve unoccupied listed buildings) which would be rendered ineffective, or substantially ineffective, by such works as are mentioned in paragraph (b) above.

2

In the case of any building specified in columns (1), (2) and (3) of the following table in relation to which any description of works is specified in column (4) of that table, sub-paragraph (1) shall have effect as if the references to works carried out in exercise of the powers conferred by Part 1 of this Act were, so far as concerns works of demolition or alteration (as opposed to extension), to works so carried out which are of a description specified in relation to it in that column.

3

Paragraphs (a) to (d) of sub-paragraph (1) shall also apply in relation to a listed building which was not such a building immediately before 17th January 2006.

4

Anything which, by virtue of section 1(4) of the Listed Buildings Act (objects or structures fixed to, or within the curtilage of, a building), is treated as part of a building for the purposes of that Act shall be treated as part of the building for the purposes of this paragraph.

Table

Local government area

Sheet of Parliamentary plans

Buildings authorised to be demolished or altered

Extent of authorised demolition or alteration

(1)

(2)

(3)

(4)

West Lothian and City of Edinburgh

54

Birdsmill Viaduct (Underbridge 240/004)

Attachment of overhead line equipment

2

Section 53 of the Listed Buildings Act (acts causing or likely to result in damage to listed buildings) shall not apply to anything done in exercise of the powers conferred by Part 1 of this Act with respect to works.

3

In this schedule—

  • the Listed Buildings Act” means the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997 (c. 9); and

  • building” and “listed building” have the same meanings as in the Listed Buildings Act.

SCHEDULE 9Code of construction practice

(introduced by section 46)

1

Before commencing construction of the authorised works located in the area of a local planning authority the authorised undertaker shall secure that the code of construction practice is submitted to that local planning authority for its written approval.

2

The local planning authority shall send a copy of every code submitted pursuant to paragraph 1, and any amendment or replacement proposed by the authorised undertaker pursuant to paragraph 3, to SNH and SEPA and shall take account of any representations made to the local planning authority by either of those bodies.

3

The authorised undertaker may with the approval of the local planning authority amend or replace the code of construction practice.

4

In approving the code of construction practice or any amendment or replacement submitted under this schedule, the local planning authority may require the authorised undertaker to make amendments to the code or to the amendment or replacement as the case may be.

5

For the purpose of any appeal against a decision of a local planning authority under this schedule, an application for approval under paragraph 1 or 3 shall be deemed to be an application for planning permission made under section 32 of the 1997 Act.

6

In this schedule—

  • SEPA” means the Scottish Environment Protection Agency established under section 20 of the Environment Act 1995 (c. 25); and

  • SNH” means Scottish Natural Heritage established under section 1 of the Natural Heritage (Scotland) Act 1991 (c. 28).

SCHEDULE 10Enactments authorising existing railways

(introduced by section 52)

Enactment

Edinburgh and Glasgow Railway Act 1838 (c.lviii)

Edinburgh and Glasgow Railway Act 1844 (c.lviii)

Edinburgh and Bathgate Railway Act 1846 (c.cccxxxii)

Caledonian Railway (Edinburgh Station and Branches) Act 1847 (c.ccxxxvii)

Edinburgh and Bathgate Railway (Deviation and Amendment) Act 1847 (c.ccxlvi)

Monkland Railways Branches Act 1857 (c.lxxviii)

North British Railway (New Works) Act 1866 (c.cclxvi)

Caledonian Railway (Additional Powers) Act 1872 (c.cxiv)

North British Railway Act 1873 (c.ccix)

Edinburgh Suburban and Southside Junction Railway Act 1880 (c.cxciv)

North British Railway Act 1888 (c.clxiii)

North British Railway (Waverley Station, &c.) Act 1891 (c.cxcii)

North British Railway (General Powers) Act 1898 (c.ccxxviii)

North British Railway Act 1901 (c.clxxxviii)

London and North Eastern Railway Order Confirmation Act 1936 (c.xliv)

British Transport Commission Order Confirmation Act 1948 (c.xxi)

British Transport Commission Order Confirmation Act 1958 (c.xxviii)

SCHEDULE 11Roads, bus lay-by, car parks and cyclepath

(introduced by sections 6 and 7)

Part 1Construction and maintenance

Sheet of Parliamentary plans

Road

Structure not to vest in roads authority

(1)

(2)

(3)

3

Work No. 4

The bridge over the railway

4

Crowwood Drive Overbridge, Clarkston, Works Nos. 2A, 6 and 7, so much of Station Road, Airdrie as is in plot no. 65 in North Lanarkshire and the footpaths between points A and B and C and D

4, 5, 6

Work No. 2B

6

Work No. 9A

6, 7

Work No. 9

7

Works Nos. 2C, 11, 12 and 13

7, 8

Work No. 10

8, 9, 10

Work No. 2E

10

Work No. 16 and the footbridge between Main Street, Caldercruix and Station Road, Caldercruix

11

Works Nos. 18 and 19

12, 13, 14, 15, 16, 17, 18, 19, 20, 21

Work No. 2F

The bridge over the railway at Bedlormie Mains Farm

16

Work No. 21

17

Works Nos. 22B and 23

19

Work No. 25B

22

Works Nos. 2G and 27 and the footpath between points C1and D1

22, 24

Work No. 2J and the footpath between points E and F

24

Work No. 31

The bridge under the railway

24

Work No. 30B

The bridge over the railway and so much of Millbank Quarry road as is in plots nos. 511, 513 and 515

24, 25

Work No. 2K

27, 29, 30

Work No. 2L

28, 29

Work No. 31A

30, 31

So much of the footpath between points G and H as is between Standhill Farm and Stonerigg Road, Armadale

31, 32, 33

Work No. 2N

32, 33

Work No. 33, so much of Work No. 34 as is in plots nos. 629, 633 and 652 in West Lothian and so much of the footpath between points J and K as is between Station Road, Armadale (B8084) and point J

33

Work No. 37

33, 34, 35, 38

Work No. 2P

38

Work No. 2Q

38, 39

Work No. 2R

40

Work No. 39B

40, 41

Work No. 2S and the footpath between points L and M

41

Work No. 40

The bridge under the railway

41

Works Nos. 41 and 42

44

Work No. 44

47

Work No. 47B

The bridge over the railway

52

Work No. 51 and so much of Work No. 52 as is in plots nos. 991, 992 and 993 in West Lothian

So much of the bridge structure as is designated by Network Rail

57

The footpath between points S and T

59

Work No. 55B

The bridge over the railway

60

Work No. 56B

The bridge over the railway

Part 2Vesting in roads authority

Authorised work

Time of vesting

(1)

(2)

Each road specified in subsection (1)

The expiry of the period during which the authorised undertaker is liable to maintain any road under subsection (2)

The car park and access provided in plots nos. 365A, 365B and 365C in North Lanarkshire

Completion of construction

The bus lay-by and car park provided in plots nos. 367, 367A and 367B in North Lanarkshire

Completion of construction

The car park provided in plot no. 990 in West Lothian

Completion of construction

The cyclepath provided in plots nos. 457 and 458 in West Lothian

Completion of construction

The cyclepath provided in plots nos. 462 and 462B in West Lothian

Completion of construction

The cyclepath provided in plots nos. 549, 550, 551 and 552A in West Lothian

Completion of construction

Part 3Vesting of private accesses

Sheet of Parliamentary plans

Private access

Structure not to vest as private access

(1)

(2)

(3)

5

Work No. 8B (Katherine Park Lane)

The bridge over the railway

13

Work No. 20B

The bridge over the railway

19

Work No. 24

The bridge over the railway

21

Work No. 26

The bridge over the railway

24

Work No. 30B

The bridge over the railway and so much of Millbank Quarry Road and Station Road as is in plots nos. 519 and 522

30, 31

Work No. 32

33

Works Nos. 35 and 36

38

Access track in plot no. 700A in West Lothian

41

Work No. 43

44, 45

Work No. 46

58

Work No. 54B

The bridge over the railway

60

Work No. 57B